Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/26/2022 Payment 0.00 0.00 36,649.12 0.00 0.00 0.00 0.00 36,649.12
2 11/23/2022 Payment 0.00 0.00 10,366.88 0.00 0.00 0.00 0.00 10,366.88
TOTAL PAYMENTS 0.00 0.00 47,016.00 0.00 0.00 0.00 0.00 47,016.00