Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/07/2023 Payment 0.00 0.00 1,117.83 0.00 0.00 0.00 0.00 1,117.83
2 05/16/2023 Payment 0.00 0.00 40,312.13 0.00 0.00 0.00 0.00 40,312.13
3 08/22/2023 Payment 0.00 0.00 11,210.17 0.00 0.00 0.00 0.00 11,210.17
4 01/29/2024 Payment 0.00 0.00 6,233.42 0.00 0.00 0.00 0.00 6,233.42
TOTAL PAYMENTS 0.00 0.00 58,873.55 0.00 0.00 0.00 0.00 58,873.55