Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/16/2022 Payment 0.00 0.00 57,060.06 0.00 56,441.54 0.00 345,586.85 459,088.45
2 01/17/2023 Audit 0.00 0.00 -0.12 0.00 253.00 0.00 23,478.67 23,731.55
TOTAL PAYMENTS 0.00 0.00 57,059.94 0.00 56,694.54 0.00 369,065.52 482,820.00