Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/12/2023 Payment 0.00 0.00 79,245.98 0.00 0.00 0.00 0.00 79,245.98
2 10/24/2023 Payment 0.00 0.00 1,409.02 0.00 50,188.65 0.00 202,620.56 254,218.23
3 11/28/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 556,492.89 556,492.89
4 08/14/2024 Audit 0.00 0.00 0.08 0.00 30,466.43 319.20 64,630.19 95,415.90
TOTAL PAYMENTS 0.00 0.00 80,655.08 0.00 80,655.08 319.20 823,743.64 985,373.00