Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/17/2023 Payment 0.00 0.00 109,567.65 0.00 3,006.02 0.00 0.00 112,573.67
2 11/22/2023 Payment 0.00 0.00 0.00 0.00 3,814.25 0.00 119,818.54 123,632.79
3 09/11/2024 Audit 0.00 0.00 -80,207.61 13,409.12 -3,349.42 0.00 81,339.45 11,191.54
TOTAL PAYMENTS 0.00 0.00 29,360.04 13,409.12 3,470.85 0.00 201,157.99 247,398.00