Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/06/2022 Payment 0.00 0.00 23,808.71 0.00 0.00 0.00 0.00 23,808.71
2 08/23/2023 Payment 0.00 0.00 39,620.83 0.00 29,525.02 0.00 0.00 69,145.85
3 09/07/2023 Payment 0.00 0.00 0.00 0.00 24,052.45 0.00 393,367.88 417,420.33
4 11/01/2023 Audit 0.00 0.00 1,080.05 0.00 13,513.36 0.00 61,201.70 75,795.11
TOTAL PAYMENTS 0.00 0.00 64,509.59 0.00 67,090.83 0.00 454,569.58 586,170.00