Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/05/2023 Payment 0.00 0.00 43,887.62 0.00 0.00 0.00 0.00 43,887.62
2 12/15/2023 Payment 0.00 0.00 0.00 0.00 14,404.14 7,429.78 307,706.65 329,540.57
3 01/25/2024 Payment 0.00 0.00 0.00 0.00 4,986.56 3,665.69 280,473.31 289,125.56
TOTAL PAYMENTS 0.00 0.00 43,887.62 0.00 19,390.70 11,095.47 588,179.96 662,553.75