Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/09/2023 Payment 0.00 0.00 52,927.32 0.00 0.00 0.00 0.00 52,927.32
2 10/26/2023 Payment 0.00 0.00 0.00 0.00 8,751.27 0.00 98,742.46 107,493.73
3 12/05/2023 Payment 0.00 0.00 0.00 0.00 31,051.13 0.00 212,693.33 243,744.46
4 01/02/2024 Audit 0.00 0.00 18,443.93 0.00 -17,175.32 0.00 32,141.88 33,410.49
TOTAL PAYMENTS 0.00 0.00 71,371.25 0.00 22,627.08 0.00 343,577.67 437,576.00