Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/08/2023 Payment 0.00 0.00 5,915.69 0.00 0.00 0.00 0.00 5,915.69
2 10/30/2023 Payment 0.00 0.00 18,633.21 0.00 0.00 0.00 0.00 18,633.21
3 01/09/2024 Payment 0.00 0.00 30,229.73 0.00 0.00 0.00 0.00 30,229.73
4 03/12/2024 Payment 0.00 0.00 13,219.04 0.00 0.00 0.00 0.00 13,219.04
TOTAL PAYMENTS 0.00 0.00 67,997.67 0.00 0.00 0.00 0.00 67,997.67