Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/13/2023 Payment 0.00 0.00 7,773.92 0.00 8,929.64 188.74 53,610.78 70,503.08
2 11/20/2023 Payment 0.00 0.00 0.00 0.00 1,641.39 0.00 149,866.23 151,507.62
3 01/31/2024 Audit 0.00 0.00 2,587.80 0.00 6,393.12 4.62 31,696.76 40,682.30
TOTAL PAYMENTS 0.00 0.00 10,361.72 0.00 16,964.15 193.36 235,173.77 262,693.00