Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/09/2023 Payment 0.00 0.00 6,520.72 0.00 0.00 0.00 5,000.00 11,520.72
2 08/22/2023 Payment 0.00 0.00 0.00 0.00 6,399.14 0.00 0.00 6,399.14
3 09/08/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 125,259.56 125,259.56
4 11/06/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 15,748.00 15,748.00
5 01/16/2024 Audit 0.00 0.00 26,146.78 0.00 6,414.51 0.00 1,441.29 34,002.58
TOTAL PAYMENTS 0.00 0.00 32,667.50 0.00 12,813.65 0.00 147,448.85 192,930.00