Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/20/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 54,138.74 54,138.74
2 10/16/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 95,005.41 95,005.41
3 12/05/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 11,276.90 11,276.90
4 01/31/2024 Audit 0.00 0.00 3,961.00 0.00 7,522.00 0.00 -0.05 11,482.95
TOTAL PAYMENTS 0.00 0.00 3,961.00 0.00 7,522.00 0.00 160,421.00 171,904.00