Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/29/2023 Payment 0.00 0.00 0.00 0.00 0.00 33,843.75 0.00 33,843.75
2 11/01/2023 Audit 0.00 0.00 0.00 0.00 0.00 -33,843.75 35,625.00 1,781.25
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 35,625.00 35,625.00