Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/29/2023 Audit 0.00 0.00 15,557.69 0.00 5,621.95 0.00 274,716.36 295,896.00
TOTAL PAYMENTS 0.00 0.00 15,557.69 0.00 5,621.95 0.00 274,716.36 295,896.00