Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/27/2022 Payment 0.00 0.00 0.00 0.00 0.00 0.00 39,777.31 39,777.31
2 11/15/2022 Audit 0.00 0.00 0.00 0.00 0.00 0.00 2,093.69 2,093.69
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 41,871.00 41,871.00