Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/04/2021 Payment 0.00 0.00 12,175.27 0.00 0.00 0.00 0.00 12,175.27
2 07/08/2021 Payment 0.00 0.00 1,757.92 0.00 0.00 0.00 0.00 1,757.92
3 08/11/2021 Payment 0.00 0.00 2,399.90 0.00 0.00 0.00 0.00 2,399.90
4 09/09/2021 Payment 0.00 0.00 2,544.17 0.00 0.00 0.00 0.00 2,544.17
5 10/15/2021 Audit 0.00 0.00 -2,576.39 0.00 5,789.31 0.00 71,707.82 74,920.74
TOTAL PAYMENTS 0.00 0.00 16,300.87 0.00 5,789.31 0.00 71,707.82 93,798.00