Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/15/2024 Audit 0.00 0.00 0.00 0.00 7,131.37 0.00 118,400.63 125,532.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,131.37 0.00 118,400.63 125,532.00