Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/26/2022 Payment 0.00 0.00 0.00 0.00 0.00 15,887.35 134,057.17 149,944.52
2 01/31/2023 Audit 0.00 0.00 0.00 0.00 0.00 -15,887.35 23,779.83 7,892.48
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 157,837.00 157,837.00