Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/14/2023 Audit 0.00 0.00 0.00 0.00 2,412.02 0.00 62,500.98 64,913.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,412.02 0.00 62,500.98 64,913.00