Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/15/2023 Audit 0.00 0.00 0.00 0.00 0.00 0.00 23,241.00 23,241.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 23,241.00 23,241.00