Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/13/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 19,869.53 19,869.53
2 01/16/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 731.47 731.47
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 20,601.00 20,601.00