Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/28/2023 Payment 0.00 0.00 0.00 0.00 0.00 4,739.87 0.00 4,739.87
2 12/19/2023 Audit 0.00 0.00 0.00 0.00 0.00 -4,739.87 9,532.00 4,792.13
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 9,532.00 9,532.00