Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/23/2023 Payment 0.00 0.00 9,900.00 0.00 0.00 0.00 0.00 9,900.00
2 11/01/2023 Audit 0.00 0.00 1,100.00 0.00 11,000.00 0.00 82,010.00 94,110.00
TOTAL PAYMENTS 0.00 0.00 11,000.00 0.00 11,000.00 0.00 82,010.00 104,010.00