Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/28/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 32,029.00 32,029.00
2 04/01/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 15,800.00 15,800.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 47,829.00 47,829.00