Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/07/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 29,550.70 29,550.70
2 11/29/2023 Audit 0.00 0.00 0.00 0.00 0.00 47,593.00 -29,550.70 18,042.30
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 47,593.00 0.00 47,593.00