Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/17/2023 Audit 0.00 0.00 0.00 0.00 0.00 0.00 103,109.00 103,109.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 103,109.00 103,109.00