The proposed project is located on the east side of Main Street (State Route 6) between East 7th Avenue to East 6th Avenue. The sidewalk is cracked and uplifted in numerous locations presenting a tripping hazard to pedestrian traffic on this corridor through Pe Ells commercial district. WSDOT, in August 2020, resurfaced State Route 6 (Main Street) through town limits and updated all road crossings with ADA compliant ramps however, the sidewalk on this block between the ramps is still in very poor condition. Completion of this proposed project will connect the new sidewalk to the north (Pe Ell Avenue to East 7th Avenue) and the newer sidewalk to the south that includes the small Pe Ell Veterans Memorial pocket park.
Projects — TIB Project Information
TIB Project Information
Town of Pe Ell's Main Street Sidewalk
P-W-964(P06)-1
P-W-964(P06)-1
Main Street Sidewalk
E 7th Ave to E 6th Ave
FY 2024 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $55,190
County: Lewis | Legislative District: 20 | Project Length: 295.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 11/28/2023
Project Information
Lead Agency | PE ELL |
Funding Year | 2024 |
Program | ATP |
Current Phase | Construction |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 0006 |
Project Length | 295.00 mi. |
ADT | 2,000 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Mayor Lonnie Willey |
Contact Email | peellclerk@centurytel.net |
TIB Engineer | Chris Langhoff |
Last Payment Date | 11/28/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/22/2022 |
Bid Auth. Approval | 03/01/2024 | 01/25/2024 |
Construction Approval | 04/01/2024 | 02/28/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 8,720 | 8,720 |
Right of Way | 0 | 0 |
Total Design | 8,720 | 8,720 |
Construction Engineering | 8,721 | 8,720 |
Construction Contract | 58,135 | 37,750 |
Other Construction | 0 | 0 |
Total Construction | 66,856 | 46,470 |
Funding Surplus | - 20,386 | |
Total TIB Funding | 55,190 | 55,190 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PE ELL | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Replace approximately 295 lineal feet of 5-foot wide sidewalk on Main Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |