The existing sidewalk on the north side of Cedar Street ends at the eastern limits of the Kalama School District ballfields, and the existing sidewalk on South 10th Street ends mid-block between Birch Street and Cedar Street. This is a gap in the sidewalk network.
Projects — TIB Project Information
TIB Project Information
City of Kalama's Cedar Street and S 10th Street Sidewalk
P-W-953(P08)-1
P-W-953(P08)-1
Cedar Street and S 10th Street Sidewalk
Near 8th St to 10th St and Cedar St to 225 ft south
FY 2023 Sidewalk Program
Current Phase : Audit
Total TIB Funding : $243,666
County: Cowlitz | Legislative District: 20 | Project Length: 0.11 | TIB Engineer: Chris Langhoff | Last Payment Date: 11/15/2023
Project Information
Lead Agency | KALAMA |
Funding Year | 2023 |
Program | SP |
Current Phase | Audit |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.11 mi. |
ADT | 250 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Kelly Rasmussen |
Contact Email | krasmussen@kalama.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 11/15/2023 |
Cultural Resource Assessment | IDP |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/07/2021 |
Bid Auth. Approval | 02/01/2023 | 03/27/2023 |
Construction Approval | 04/15/2023 | 05/03/2023 |
Project Closeout | 11/30/2023 | 11/09/2023 |
Audit Date | 11/15/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 41,540 | 46,155 |
Right of Way | 0 | 0 |
Total Design | 41,540 | 46,155 |
Construction Engineering | 41,540 | 27,780 |
Construction Contract | 276,930 | 207,361 |
Other Construction | 0 | 0 |
Total Construction | 318,470 | 235,141 |
Funding Surplus | - 116,344 | |
Total TIB Funding | 243,666 | 281,296 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KALAMA | 37,630 | 13.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 37,630 | 13.4% |
Project Description
Extending the existing sidewalk on Cedar Street east to South 10th Street, and extending the existing sidewalk on South 10th Street north to Cedar Street will fill a gap in the City sidewalk system, providing residents with a safe and accessible route to the Kalama School District ballfields, elementary, middle, and high schools.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |