There is currently a 2-1/2 block gap in the sidewalk on the south side of 4th Street between Tonasket Avenue and the K-12 school campus. 4th Street is one of the primary connectors between the residential area on the west side of town, the downtown corridor, and the Tonasket School District campus. The campus includes K-12 schools, tennis courts, the football stadium, baseball/softball fields and track. The City and School District are coordinating to improve bicycle routes for students, residents, and visitors. The existing width of 4th Street provides adequate room to add bike lanes on each side of the road. Additionally, the downtown corridor regularly experiences flooding during large storm events.
Projects — TIB Project Information
TIB Project Information
City of Tonasket's 4th Street Multimodal
P-P-885(P01)-1
P-P-885(P01)-1
4th Street Multimodal
Multiple Locations
FY 2024 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $349,974
County: Okanogan | Legislative District: 7 | Project Length: 1,050.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 03/15/2024
Project Information
Lead Agency | TONASKET |
Funding Year | 2024 |
Program | ATP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 1050.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Alice Attwood |
Contact Email | clerktreasurer@tonasketwa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 03/15/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 03/30/2023 |
Bid Auth. Approval | 07/19/2023 | 07/19/2023 |
Construction Approval | 07/31/2023 | 08/08/2023 |
Project Closeout | 02/15/2024 | 03/06/2024 |
Audit Date | 03/15/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 51,690 | 45,896 |
Right of Way | 0 | 0 |
Total Design | 51,690 | 45,896 |
Construction Engineering | 39,528 | 62,265 |
Construction Contract | 304,059 | 253,578 |
Other Construction | 0 | 0 |
Total Construction | 343,587 | 315,843 |
Funding Surplus | - 45,303 | |
Total TIB Funding | 349,974 | 361,739 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TONASKET | 11,765 | 3.3% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 11,765 | 3.3% |
Project Description
Construct 5-foot sidewalk on the south side, and bike lanes on both sides of 4th Street within existing pavement width. Install ADA-compliant ramps at each intersection.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Creates direct access to school complex/business district/etc.;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |