City of Medina's Medina Elementary School Sidewalks

P-P-109(P04)-1

P-P-109(P04)-1
Medina Elementary School Sidewalks

NE 8th St to Overlake Dr W

FY 2024 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $152,800

County: King   |   Legislative District: 48   |   Project Length: 430.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 09/15/2023

Project Information

Lead Agency MEDINA
Funding Year 2024
Program ATP
Current Phase Audit
Legislative District 48
Congressional District 1
Federal Route Number 9999
Project Length 430.00 mi.
ADT 500
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Ryan Osada
Contact Email rosada@medina-wa.gov
TIB Engineer Greg Armstrong
Last Payment Date 09/15/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 12/12/2022
Bid Auth. Approval 05/15/2023 05/02/2023
Construction Approval 05/25/2023 05/30/2023
Project Closeout 09/15/2023 09/11/2023
Audit Date   09/15/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 16,985 20,000
Right of Way 0 0
Total Design 16,985 20,000
     
Construction Engineering 11,125 13,100
Construction Contract 74,690 164,733
Other Construction 0 0
Total Construction 85,815 177,833
     
Funding Increase 50,000  
Total TIB Funding 152,800 197,833

Local Funding Partners

Funding Amount Percent
MEDINA 45,033 22.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 45,033 22.8%

Project Description

The gravel trail will be replaced with an accessible sidewalk, extending the recent improvements on NE 8th St to Overlake Dr. W along 81st Avenue NE. The existing planting strips between the new sidewalk and the asphalt wedge curb will remain.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.