City of Bellevue's NE 8th Street

P-P-103(P04)-1

P-P-103(P04)-1
NE 8th Street

Parcel Frontage at 11635 NE 8th St

FY 2023 Sidewalk Program
Current Phase : Withdrawn
Total TIB Funding : $32,990

County: King   |   Legislative District: 48   |   Project Length: 0.03   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 03/27/2024

Project Information

Lead Agency BELLEVUE
Funding Year 2023
Program SP
Current Phase Withdrawn
Legislative District 48, 41
Congressional District 9
Federal Route Number 2040
Project Length 0.03 mi.
ADT 35,600
Functional Class Principal
Type of Work Pedestrian
Project Contact Mia Waters
Contact Email mwaters@bellevuewa.gov
TIB Engineer Greg Armstrong
Last Payment Date 03/27/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/01/2022 02/22/2022
Bid Auth. Approval 03/31/2024
Construction Approval 04/15/2024
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date   04/02/2024

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 32,990 50,975
Right of Way 0 0
Total Design 32,990 50,975
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 32,990 50,975

Local Funding Partners

Funding Amount Percent
BELLEVUE 17,985 35.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 17,985 35.3%

Project Description

This project will fill the sidewalk gap by constructing approximately 150 feet of 8-ft wide, ADA accessible sidewalk along the frontage of the parcal at 11635 NE 8th Street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments