There is a half block section of sidewalk missing connecting downtown Tekoa to adjacent residential areas. Without this connection non vehicular traffic must traverse a rocky ungraded shoulder. The path is not ADA compliant and the existing sidewalk features two ramps that are also not ADA compliant.
Projects — TIB Project Information
TIB Project Information
City of Tekoa's Main Street Sidewalk
P-E-919(P06)-1
P-E-919(P06)-1
Main Street Sidewalk
Crosby St to Broadway St
FY 2023 Sidewalk Program
Current Phase : Audit
Total TIB Funding : $92,185
County: Whitman | Legislative District: 9 | Project Length: 0.02 | TIB Engineer: Jonathan Heusman | Last Payment Date: 02/14/2023
Project Information
Lead Agency | TEKOA |
Funding Year | 2023 |
Program | SP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.02 mi. |
ADT | 250 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Eliza Evans-Teague |
Contact Email | tekoaclerk@palousenet.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 02/14/2023 |
Cultural Resource Assessment | IDP |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2022 | 01/21/2022 |
Bid Auth. Approval | 05/15/2022 | 05/11/2022 |
Construction Approval | 06/15/2022 | 06/09/2022 |
Project Closeout | 02/28/2023 | 02/09/2023 |
Audit Date | 02/14/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 10,095 | 10,051 |
Right of Way | 0 | 0 |
Total Design | 10,095 | 10,051 |
Construction Engineering | 10,095 | 11,508 |
Construction Contract | 67,300 | 70,625 |
Other Construction | 0 | 0 |
Total Construction | 77,395 | 82,133 |
Funding Increase | 7,217 | |
Funding Surplus | - 2,522 | |
Total TIB Funding | 92,185 | 92,185 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TEKOA | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Construct a short 125 ft section of sidewalk, replacing two existing ADA ramps with a single two way ramp and installing two one way ramps a much more accessible route can be provided for non vehicular travel.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Improves mobility;
- Completes gap
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |