Currently, there is not a pedestrian connection between the City Park and downtown area. Pedestrians currently walk in the street to get from one facility to another. This sidewalk would also be a main connection between downtown and the school.
Projects — TIB Project Information
TIB Project Information
Town of LaCrosse's Main Street Sidewalks
P-E-912(P04)-1
P-E-912(P04)-1
Main Street Sidewalks
2nd St to A St
FY 2024 Active Transportation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Whitman | Legislative District: 9 | Project Length: 450.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | LACROSSE |
Funding Year | 2024 |
Program | ATP |
Current Phase | Withdrawn |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 450.00 mi. |
ADT | 275 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Mayor Randy Camp |
Contact Email | lacrosse@pionnet.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA & BER |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/23/2022 |
Bid Auth. Approval | 09/15/2023 | |
Construction Approval | 10/01/2023 | |
Project Closeout | 08/10/2024 | |
Audit Date | ||
Withdrawn Date | 02/01/2023 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LACROSSE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Install a sidewalk along the south side of Main Avenue.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |