Town of LaCrosse's Main Avenue and 2nd Street Sidewalk

P-E-912(P03)-1

P-E-912(P03)-1
Main Avenue and 2nd Street Sidewalk

2nd Street from Main Ave to Crystal Ave

FY 2023 Sidewalk Program
Current Phase : Construction
Total TIB Funding : $585,040

County: Whitman   |   Legislative District: 9   |   Project Length: 0.07   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 04/11/2024

Project Information

Lead Agency LACROSSE
Funding Year 2023
Program SP
Current Phase Construction
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.07 mi.
ADT 200
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Randy Camp
Contact Email lacrosse@pionnet.com
TIB Engineer Jonathan Heusman
Last Payment Date 04/11/2024
Cultural Resource Assessment IDP

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
DAHP Assessment Date   02/22/2024
Predesign Approval
Design Approval 02/01/2022 01/20/2022
Bid Auth. Approval 03/31/2024 02/22/2024
Construction Approval 04/30/2024 04/08/2024
Project Closeout 09/01/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 87,973 64,400
Right of Way 0 0
Total Design 87,973 64,400
     
Construction Engineering 69,921 70,600
Construction Contract 533,848 450,040
Other Construction 0 0
Total Construction 603,769 520,640
     
Funding Surplus - 106,702  
Total TIB Funding 585,040 585,040

Local Funding Partners

Funding Amount Percent
LACROSSE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will 1.) replace cracked, heaved and non-existent sidewalks on the east side of 2nd St from Main Ave to Crystal St and provide ADA compliant access at the intersection of 2nd St and Crystal Ave 2.) replace and install new ADA compliant access at the intersection of Main St and 2nd St and 3.) replace cracked and heaved sidewalk panels along the west side of 2nd St which are a trip hazard. For economy of scale, this project was combined with P-E-912(P04)-1 which installs a sidewalk along the south side of Main Avenue from 2nd St to A St.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.