The Valleyview Avenue, Third Street, and Southern Avenue improvement project is proposed for the 3,300 LF section on Valleyview Avenue (1st Street to 3rd Street), South Third Street (Valleyview Avenue to Southern Avenue), and Southern Avenue (3rd Street to 1st Street). The existing roadway is only 22 feet wide for a majority of its length with very limited curb and gutter, no sidewalk, limited street lighting, and no storm drainage facilities. This route is a designated bike and walking route. School buses drop off and pick up a large amount of children at the corner of Third Street and Pleasant Avenue. With no sidewalks along the roadway, the children unsafely walk on the edge of the travel lanes.
Projects — TIB Project Information
TIB Project Information
City of Selah's Valleyview Avenue / Third Street / Southern Avenue
P-E-182(P03)-1
P-E-182(P03)-1
Valleyview Avenue / Third Street / Southern Avenue
S First Ave to S First Ave
FY 2023 Sidewalk Program
Current Phase : Audit
Total TIB Funding : $272,607
County: Yakima | Legislative District: 15 | Project Length: 0.64 | TIB Engineer: Jonathan Heusman | Last Payment Date: 10/31/2023
Project Information
Lead Agency | SELAH |
Funding Year | 2023 |
Program | SP |
Current Phase | Audit |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 4709 |
Project Length | 0.64 mi. |
ADT | 2,050 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Rocky Wallace |
Contact Email | rocky.wallace@selahwa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 10/31/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 01/01/2023 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/22/2021 |
Bid Auth. Approval | 11/15/2022 | 11/21/2022 |
Construction Approval | 01/15/2023 | 01/30/2023 |
Project Closeout | 12/31/2023 | 10/31/2023 |
Audit Date | 10/31/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 52,188 | 272,607 |
Construction Contract | 347,812 | 657,054 |
Other Construction | 0 | 0 |
Total Construction | 400,000 | 929,661 |
Funding Surplus | - 127,393 | |
Total TIB Funding | 272,607 | 929,661 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SELAH | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Federal Funding | 657,054 | 70.7% |
Total Local Funding | 657,054 | 70.7% |
Project Description
Reconstruction of Valleyview Avenue, Third Street, and Southern Avenue to a 28-foot wide, two-lane roadways. The project will include curb and gutters, sidewalks, intersection curb ramps, storm drainage facilities, and illumination system.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |