TIB Project Information

City of Castle Rock's Complete Streets Award

C-W-952(001)-1

C-W-952(001)-1
Complete Streets Award

March 2019 Selection

FY 2020 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $200,000

County: Cowlitz   |   Legislative District: 20   |   Project Length: 0.10   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 05/02/2019

Project Information

Lead Agency CASTLE ROCK
Funding Year 2020
Program CSP
Current Phase Audit
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class Local Access
Type of Work Pedestrian
Project Contact David Vorse
Contact Email crpwd@ci.castle-rock.wa.us
TIB Engineer Chris Langhoff
Last Payment Date 05/02/2019
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   03/28/2019
Delayed Project Date 07/01/2021  
DAHP Assessment Date  
Predesign Approval
Design Approval 05/01/2019
Bid Auth. Approval 05/01/2019
Construction Approval 04/22/2019 04/22/2019
Project Closeout 12/31/2021 03/30/2023
Audit Date   03/30/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 200,000 200,000
Other Construction 0 0
Total Construction 200,000 200,000
     
Total TIB Funding 200,000 200,000

Local Funding Partners

Funding Amount Percent
CASTLE ROCK 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Construct pedestrian relief island on SB ramp to I-5
at exit 49, west side
Pedestrian Mar 2019 $37,000 $ 0
Provide alignment of crosswalk with pedstrian safety
Re-align crosswalks on west side of I-5 to be pedestrian
/ bike friendly
Pedestrian; Bicycle Mar 2019 $10,000 $ 0
Pavement markings at SB I-5 ramp - 900 sq.ft.
Construct 200 feet of shared use path from SB ramp
(SR 411) south side
Pedestrian; Bicycle Mar 2019 $25,000 $18,407
10 foot by 4 inch thick concrete shared use path with ADA ramps bewtween SB ramp to driveway in ROW
Traffic mangement of existing shoulder on SR 411 Pedestrian; Bicycle Mar 2019 $10,000 $39,757
Reduce lanes to 11' wide
Replace 34 ADA ramps constructed in the 1970's -90's
to current code
Pedestrian Mar 2019 $110,000 $112,712
Located on Cowlitz, A, B and C Streets; and Leaming, 1st, 2nd, 3rd and 4th.
Replace 80 feet of broken up sidewalk on Cowlitz St.
East, 100 block
Pedestrian Mar 2019 $13,000 $3,534
100 Block of Cowlitz Street East from Huntington Ave. east toward Kirby Ave. SE (both are arterial streets)
Install pedestrian friendly lighting along ped. corrider/widen
shoulder on Huntington Ave.
Pedestrian; Bicycle Jun 2020 $42,000 $104,402
Provide pedestrian safety lighting for pedestrian corridor

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments