Projects — TIB Project Information
TIB Project Information
City of Lakewood's Complete Streets Award
C-P-199(002)-1
C-P-199(002)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $746,000
County: Pierce | Legislative District: 29 | Project Length: 0.00 | TIB Engineer: Greg Armstrong | Last Payment Date: 06/07/2022
Project Information
Lead Agency | LAKEWOOD |
Funding Year | 2023 |
Program | CSP |
Current Phase | Audit |
Legislative District | 29 |
Congressional District | 10 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Ted Hill |
Contact Email | chill@cityoflakewood.us |
TIB Engineer | Greg Armstrong |
Last Payment Date | 06/07/2022 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/28/2022 | |
Delayed Project Date | 03/28/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 04/15/2022 | |
Bid Auth. Approval | 04/15/2022 | |
Construction Approval | 05/01/2022 | 04/06/2022 |
Project Closeout | 12/31/2023 | 10/16/2023 |
Audit Date | 10/16/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 746,000 | 746,000 |
Other Construction | 0 | 0 |
Total Construction | 746,000 | 746,000 |
Total TIB Funding | 746,000 | 746,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LAKEWOOD | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Design and construct of new pathways | Pedestrian; Bicycle | Mar 2022 | $746,000 | $746,000 | |
The City proposes to use the TIB grant funds to construct a sidewalk on Angle Lane between Hipkins and Elwood to connect pedestrians and cyclists to Fort Steilacoom Park. Further, the funds will be used to construct a shared use path within the ROW of Elwood Road SW between Angle Lane and 87th ST SW then sidewalk on one side of 87th to the new sidewalks along Steilacoom Blvd. This completes the non-motorized pathways allowing for easier access to Fort Steilacoom Park as well as a route for cyclists to use with less traffic. The total project cost is estimated at $823,000 and the City is committed to funding the gap. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |