Wine Country Road(WCR) and McCreadie Road is one of the two entrance and exit routes to the City of Grandview from I-82. Located at Exit 75 of I-82, it is 2.4 miles from the only other ramp at Exit 73. Major freight traffic is constant, serving businesses and outlying communities beyond the City. The commercial district at the east end of the City (approximately 1,000' west of the intersection) has progressively developed, increasing the traffic and congestion at this intersection. There are several other large parcels of undeveloped, industrial and commercial zoned land adjacent to WCR near the intersection. As these areas further develop, it will be an increased strain on the this intersection. McCreadie Road is the stop controlled leg of the intersection, and with the amount of traffic on these roadways, it is difficult for trucks to turn onto WCR. This causes challenges for pedestrians and cyclists, and also backs up traffic to the WSDOT exit ramp.
Projects — TIB Project Information
TIB Project Information
City of Grandview's Wine Country Road
8-4-183(004)-1
8-4-183(004)-1
Wine Country Road
McCreadie Rd Intersection
FY 2023 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,582,684
County: Yakima | Legislative District: 15 | Project Length: 0.15 | TIB Engineer: Jonathan Heusman | Last Payment Date: 10/17/2023
Project Information
Lead Agency | GRANDVIEW |
Funding Year | 2023 |
Program | UAP |
Current Phase | Construction |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 8056 |
Project Length | 0.15 mi. |
ADT | 18,500 |
Functional Class | Minor |
Type of Work | Traffic Control |
Project Contact | Cus Arteaga |
Contact Email | carteaga@grandview.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 10/17/2023 |
Cultural Resource Assessment | IDP |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | 03/03/2023 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/16/2021 |
Bid Auth. Approval | 03/01/2023 | 03/08/2023 |
Construction Approval | 04/30/2023 | 04/04/2023 |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 172,962 | 192,180 |
Right of Way | 45,000 | 1,861 |
Total Design | 217,962 | 194,041 |
Construction Engineering | 163,962 | 182,180 |
Construction Contract | 1,130,760 | 1,399,132 |
Other Construction | 0 | 0 |
Total Construction | 1,294,722 | 1,581,312 |
Funding Increase | 70,000 | |
Total TIB Funding | 1,582,684 | 1,775,353 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GRANDVIEW | 24,569 | 1.4% |
WSDOT Funding | 0 | 0.0% |
SIED | 168,100 | 9.5% |
Total Local Funding | 192,669 | 10.9% |
Project Description
The project will reconstruct the Wine Country Road and McCreadie Road intersection into a roundabout. The project includes a two-lane urban section with curb and gutter, 10’ shared use pathway, regional pathway connection, handicap ramps, storm drainage facilities, and illumination system. A roundabout would eliminate the current left turn movement problem of the current roadway configuration.
Existing Condition
Project Benefits
- Benefits of this project include directly encouraging alternative modesof travel, improving system continuity, reducing congestion during high industrial and agricultural production seasons, and providing access for continuing economic development.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |