Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Medical Lake's Barker Street

8-3-897(003)-1

8-3-897(003)-1
Barker Street

Lefevre St (SR 902) to Stanley St

FY 2023 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $750,841

County: Spokane   |   Legislative District: 6   |   Project Length: 0.37   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 11/21/2023

Project Information

Lead Agency MEDICAL LAKE
Funding Year 2023
Program UAP
Current Phase Construction
Legislative District 6
Congressional District 5
Federal Route Number 32MM
Project Length 0.37 mi.
ADT 2,000
Functional Class Collector
Type of Work Reconstruction
Project Contact Scott Duncan
Contact Email sduncan@medical-lake.org
TIB Engineer Andrew Beagle
Last Payment Date 11/21/2023
Cultural Resource Assessment IDP

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2026  
DAHP Assessment Date   06/17/2022
Predesign Approval
Design Approval 02/01/2022 01/11/2022
Bid Auth. Approval 03/15/2023 05/31/2023
Construction Approval 06/30/2023 06/26/2023
Project Closeout 02/15/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 70,020 77,800
Right of Way 0 0
Total Design 70,020 77,800
     
Construction Engineering 55,980 70,000
Construction Contract 553,914 686,468
Other Construction 0 0
Total Construction 609,894 756,468
     
Funding Increase 70,927  
Total TIB Funding 750,841 834,268

Local Funding Partners

Funding Amount Percent
MEDICAL LAKE 83,427 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 83,427 10.0%

Project Description

The proposed solution is removal of the existing chip seal/pavement layers and construct a Full Depth Reclamation of the roadway base followed by new hot mix asphalt. It is proposed to narrow the traffic lanes to 11' to slow traffic and the section from SR 902 East to Washington is wide enough to add 2 bike lanes. It is proposed to widen the roadway from 24' to 30' from Washington East to Stanley to provide 2 new bike lanes. A sidewalk is proposed on the North side of Barker St. This will shorten the sidewalk gap to 2 missing blocks on Stanley to complete the entire sidewalk system from the High School to the Fox Hollow housing development North of SR 902. The City is planning to apply for SRTC and WSDOT Ped. funds to complete the 2 blocks on Stanley as part of their application to upgrade the handicap ramps on Lake St. New turn lanes are proposed at either end of Barker St. and on the North leg of the Washington/Barker intersection to relieve school and event traffic and bus congestion and waiting times on Barker.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments