Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Spokane Valley's Sullivan Road

8-3-208(012)-1

8-3-208(012)-1
Sullivan Road

Sprague Ave to 8th Ave

FY 2023 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,641,462

County: Spokane   |   Legislative District: 4   |   Project Length: 0.50   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/12/2024

Project Information

Lead Agency SPOKANE VALLEY
Funding Year 2023
Program UAP
Current Phase Construction
Legislative District 4
Congressional District 5
Federal Route Number 4103
Project Length 0.50 mi.
ADT 21,300
Functional Class Principal
Type of Work Reconstruction
Project Contact Kelly Lynch, PE
Contact Email klynch@spokanevalley.org
TIB Engineer Andrew Beagle
Last Payment Date 02/12/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2022 01/05/2022
Bid Auth. Approval 02/15/2023 02/23/2023
Construction Approval 04/01/2023 04/19/2023
Project Closeout 06/30/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 47,447 251,475
Right of Way 403,200 241,369
Total Design 450,647 492,844
     
Construction Engineering 123,830 610,980
Construction Contract 1,066,985 3,728,471
Other Construction 0 66,814
Total Construction 1,190,815 4,406,265
     
Total TIB Funding 1,641,462 4,899,109

Local Funding Partners

Funding Amount Percent
SPOKANE VALLEY 1,830,402 37.4%
WSDOT Funding 0 0.0%
NHS Asset Management Grant (via WSDOT)  1,029,000 29.7%
WA Dept of Ecology Stormwater Grant  398,245 8.1%
 
 
 
 
 
 
Total Local Funding 3,257,647 78.1%

Project Description

The project will first protect and restore the resilience of the full-depth road section by providing a heavy grind and overlay of the existing asphalt wearing surface and by providing full-depth repair at spots with localized failure (i.e. patching). Restricted turning movements (via extending the curbed median near Sprague Ave.) is expected to reduce the number of left-turn angle-T collisions caused by vehicles using the commercial driveways and crashing with north-south traffic on Sullivan Rd. Also, revised striping/channelization at the intersection of 4th Ave. will install north/south left turn lanes from 4th Ave. to Sullivan Rd., improving intersection safety and capacity. Stormwater improvements include a combination of new catch basins, drywells, proprietary water quality technologies and bio-infiltration swales. Sidewalk improvements provide nearly 925 feet of infill on the west side between 4th and 8th Ave. and will eliminate the sidewalk “gap” within the project limits. New ITS infrastructure (fiber and cameras) will be installed from Sprague Ave. to 8th Ave., extending the network south by connecting the signals at 4th and 8th Avenues to the regional ITS network.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments