The pavement condition of 73rd Ave NE is deteriorating. Further deterioration will lead to increasing costs to repair and potential damage to vehicles. There are several sidewalk panels that are uplifted due to tree roots and some panels that are damaged. All of these locations inhibit accessibility for both the abled and disabled community. Trip hazards effect both groups and some locations are not accessible to wheel chairs forcing them into the street. This road is one of three roads that run north/south on the north end of the City. Bicyclists use this road to connect to the park and ride at NE 181st St, downtown, Kenmore Elementary, and to the Burke Gilman Trail at state route 522.
Projects — TIB Project Information
TIB Project Information
City of Kenmore's 73rd Avenue NE
8-1-206(002)-1
8-1-206(002)-1
73rd Avenue NE
NE 181st St and NE 192nd St
FY 2024 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $920,000
County: King | Legislative District: 46 | Project Length: 0.66 | TIB Engineer: Greg Armstrong | Last Payment Date: 03/25/2024
Project Information
Lead Agency | KENMORE |
Funding Year | 2024 |
Program | UAP |
Current Phase | Construction |
Legislative District | 46 |
Congressional District | 1 |
Federal Route Number | 2419 |
Project Length | 0.66 mi. |
ADT | 8,479 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Terri Bielenberg |
Contact Email | tbielenberg@kenmorewa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 03/25/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 01/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/26/2023 |
Bid Auth. Approval | 02/06/2023 | 02/01/2023 |
Construction Approval | 02/28/2023 | 03/02/2023 |
Project Closeout | 04/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 49,998 | 185,073 |
Construction Contract | 750,002 | 1,465,062 |
Other Construction | 0 | 0 |
Total Construction | 800,000 | 1,650,135 |
Funding Increase | 120,000 | |
Total TIB Funding | 920,000 | 1,650,135 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KENMORE | 730,135 | 44.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 730,135 | 44.2% |
Project Description
This project will grind 2 inches of pavement and overlay 73rd avenue. The road will be restriped with bike lanes in each direction and 10 foot travel lanes. The sidewalk on both sides of the street will be repaired and made ADA accessible.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers;
- Builds multimodal facilities
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |