This street is the main route to the only high school in Skamania County, and therefore it sees a large number vehicles on a daily basis. It is also the main route to and from Department of Natural Resources land, Federal Forest land and private timber company lands, which use this street to transport timber after harvesting. The community relies on timber dollars to fund a variety of services that are essential to the well being of its residents.
Projects — TIB Project Information
TIB Project Information
City of Stevenson's Loop Street
6-W-974(006)-1
6-W-974(006)-1
Loop Street
Columbia Ave to E C/L
FY 2024 Small City Arterial Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Skamania | Legislative District: 14 | Project Length: 0.90 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | STEVENSON |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Withdrawn |
Legislative District | 14 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.90 mi. |
ADT | 1,300 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Carolyn Sourek |
Contact Email | carolyn@ci.stevenson.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/01/2023 | 02/17/2023 |
Bid Auth. Approval | 08/15/2023 | |
Construction Approval | 09/01/2023 | |
Project Closeout | 09/01/2024 | |
Audit Date | ||
Withdrawn Date | 05/04/2023 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
STEVENSON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
By rebuilding, resurfacing, and adding sidewalk to this roadway, and repairing the failing stormwater system, we are providing continued, direct access to not only millions of acres of timber lands, but also the chance for our younger members of the community to receive an education at the county's only high school. ADA compliance is unknown, but would be addressed as part of this project. Additionally, the potential for adding designated bike paths would connect residents with future anticipated facilities to convey them safely to the business district as well as the high school.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |