Hancock Avenue is in need of improvements. From its intersection with Surf Street to its intersection with Anchor Drive, Hancock Avenue currently has a gravel surface. This section of Hancock Avenue helps to serve residential as well as commercial buildings with access to the beach. Hancock Avenue connects with SR 105 (S Forrest St.) as its Western Termini. This improvement to Hancock Avenue, would improve city circulation, as it would improve access to and from the beach.
Projects — TIB Project Information
TIB Project Information
City of Westport's Hancock Avenue
6-W-960(005)-1
6-W-960(005)-1
Hancock Avenue
Surf St to Anchor Dr
FY 2023 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $263,614
County: Grays Harbor | Legislative District: 19 | Project Length: 0.07 | TIB Engineer: Chris Langhoff | Last Payment Date: 02/14/2023
Project Information
Lead Agency | WESTPORT |
Funding Year | 2023 |
Program | SCAP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.07 mi. |
ADT | 250 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | David Nielsen |
Contact Email | david@jacksoncivil.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 02/14/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/21/2021 |
Bid Auth. Approval | 05/01/2022 | 06/21/2022 |
Construction Approval | 08/10/2022 | 07/26/2022 |
Project Closeout | 02/28/2023 | 02/13/2023 |
Audit Date | 02/14/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 19,000 | 29,475 |
Right of Way | 0 | 0 |
Total Design | 19,000 | 29,475 |
Construction Engineering | 19,000 | 35,086 |
Construction Contract | 199,098 | 213,453 |
Other Construction | 0 | 0 |
Total Construction | 218,098 | 248,539 |
Funding Increase | 26,975 | |
Funding Surplus | - 459 | |
Total TIB Funding | 263,614 | 278,014 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WESTPORT | 14,400 | 5.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 14,400 | 5.2% |
Project Description
This project proposes the improve Hancock Avenue with the construction of a new paved surface to replace the existing gravel road. Construction would include improvements to the existing road subgrade, new paving surface, and striping.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Improves arterial network;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |