The existing gravel road provides access to driveways and is not a through street. This creates a barrier between the residential community surrounding Spruce Street and the shopping and services provided on Market Street and Mullis Street. This missing street network connection increases out of direction travel. For residents in this area to reach Market Street, they must either drive an additional 1/3 mile or walk on uneven gravel surfaces.
Projects — TIB Project Information
TIB Project Information
Town of Friday Harbor's Nash Street
6-W-831(009)-1
6-W-831(009)-1
Nash Street
Market St to Spruce St
FY 2023 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $714,231
County: San Juan | Legislative District: 40 | Project Length: 0.11 | TIB Engineer: Chris Langhoff | Last Payment Date: 01/02/2024
Project Information
Lead Agency | FRIDAY HARBOR |
Funding Year | 2023 |
Program | SCAP |
Current Phase | Audit |
Legislative District | 40 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.11 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | New Location |
Project Contact | Denice Kulseth |
Contact Email | dkulseth@fridayharbor.org |
TIB Engineer | Chris Langhoff |
Last Payment Date | 01/02/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 01/01/2023 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/01/2022 | 03/10/2022 |
Bid Auth. Approval | 06/01/2023 | 05/01/2023 |
Construction Approval | 05/24/2023 | 06/16/2023 |
Project Closeout | 12/31/2023 | 12/21/2023 |
Audit Date | 01/02/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 87,363 | 158,300 |
Construction Contract | 582,420 | 856,070 |
Other Construction | 0 | 0 |
Total Construction | 669,783 | 1,014,370 |
Funding Increase | 44,448 | |
Total TIB Funding | 714,231 | 1,014,370 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FRIDAY HARBOR | 300,139 | 29.6% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 300,139 | 29.6% |
Project Description
This project will construct a street connecting Spruce Street to Market Street, completing a gap in the vehicle and pedestrian transportation networks.
Existing Condition
Project Benefits
- Improves safety;
- Improves pedestrian safety;
- Improves arterial network;
- Improves mobility;
- Completes gap;
- Optimizes traffic flow;
- Improves vehicle and pedestrian access
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |