County Road connects SR 170 and the Central Business District to the industrial/agricultural facilities in the northern portion of the City and extending north as Road U SE to I-90. The road is used by the agricultural production facilities within the City limits, as well as farm to market trucks and traffic passing through the City. Truck use of the roadway is very heavy during harvest times. The City is also exploring the possibility of constructing a truck park and ride type facility that would be located just north of the project limits. The existing roadway shows signs of subgrade failure (alligator cracking) as well as other signs of distress (thermal cracking, etc.).
Projects — TIB Project Information
TIB Project Information
City of Warden's N County Road
6-E-866(004)-1
6-E-866(004)-1
N County Road
First St(SR 170) to N C/L
FY 2022 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $692,368
County: Grant | Legislative District: 13 | Project Length: 0.51 | TIB Engineer: Jonathan Heusman | Last Payment Date: 01/16/2024
Project Information
Lead Agency | WARDEN |
Funding Year | 2022 |
Program | SCAP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | N131 |
Project Length | 0.51 mi. |
ADT | 1,500 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Kristine Shuler |
Contact Email | kshuler@cityofwarden.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 01/16/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2020 | |
Delayed Project Date | 07/01/2023 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2021 | 12/16/2020 |
Bid Auth. Approval | 05/30/2022 | 06/03/2022 |
Construction Approval | 06/25/2022 | 07/15/2022 |
Project Closeout | 12/31/2023 | 01/04/2024 |
Audit Date | 01/16/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 75,150 | 83,500 |
Right of Way | 0 | 0 |
Total Design | 75,150 | 83,500 |
Construction Engineering | 75,150 | 83,500 |
Construction Contract | 502,200 | 602,298 |
Other Construction | 0 | 0 |
Total Construction | 577,350 | 685,798 |
Funding Increase | 81,040 | |
Funding Surplus | - 41,172 | |
Total TIB Funding | 692,368 | 769,298 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WARDEN | 76,930 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 76,930 | 10.0% |
Project Description
The existing roadway will be pulverized, cement-treated, and overlaid with new asphalt.
Existing Condition
Project Benefits
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |