TIB Project Information

City of Ritzville's Main Avenue

6-E-845(008)-1

6-E-845(008)-1
Main Avenue

Palouse St to Jackson St

FY 2022 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $355,601

County: Adams   |   Legislative District: 9   |   Project Length: 0.35   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 10/31/2023

Project Information

Lead Agency RITZVILLE
Funding Year 2022
Program SCAP
Current Phase Audit
Legislative District 9
Congressional District 4
Federal Route Number 9999
Project Length 0.35 mi.
ADT 550
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Scott Yaeger
Contact Email scotty@co.adams.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date 10/31/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/20/2020
Delayed Project Date 07/01/2023  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2021 12/18/2020
Bid Auth. Approval 03/15/2021 03/18/2021
Construction Approval 05/05/2021 05/05/2021
Project Closeout 10/31/2023 10/19/2023
Audit Date   10/31/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 9,500 30,113
Right of Way 0 0
Total Design 9,500 30,113
     
Construction Engineering 43,700 37,799
Construction Contract 253,413 305,302
Other Construction 23,988 16,467
Total Construction 321,101 359,568
     
Funding Increase 25,000  
Total TIB Funding 355,601 389,681

Local Funding Partners

Funding Amount Percent
RITZVILLE 34,080 8.7%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 34,080 8.7%

Project Description

This section of street was last slurry sealed in approximately 2004 and is in need of pavement preservation to seal the existing pavement. This project involves updating 22 ADA ramp to meet current standards, pavement repair and pre-level in areas showing distress, Adams County to provide and chip seal, and Contractor to provide a Slurry Seal over the chip seal for smoothness. The existing surfacing and subsurface have withstood the traffic loading and have proven to be sufficient still today. The City of Ritzville was able to secure TIB funding last year 2019 for this project Main Ave 2-E-845(007)-1 and the Cities Engineering firm has gotten to the point for establishing a estimate for the work planned but the funding was short by approximately $90,000. TIB staff and Director has suggested that the City withdrawl this project and submitt this project in 2020 under the SCAP Project application.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.