TIB Project Information

City of Lynden's 2021 Overlay

3-W-839(005)-1

3-W-839(005)-1
2021 Overlay

Multiple Locations

FY 2023 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $328,536

County: Whatcom   |   Legislative District: 42   |   Project Length: 0.38   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 03/15/2023

Project Information

Lead Agency LYNDEN
Funding Year 2023
Program APP
Current Phase Audit
Legislative District 42
Congressional District 1
Federal Route Number 8158
Project Length 0.38 mi.
ADT 0
Functional Class Minor
Type of Work Resurfacing
Project Contact Mark Sandal
Contact Email sandalm@lyndenwa.org
TIB Engineer Chris Langhoff
Last Payment Date 03/15/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2022 12/08/2021
Bid Auth. Approval 06/01/2022 05/25/2022
Construction Approval 07/01/2022 06/17/2022
Project Closeout 02/28/2023 03/07/2023
Audit Date   03/15/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 47,619 57,302
Right of Way 0 0
Total Design 47,619 57,302
     
Construction Engineering 47,619 74,575
Construction Contract 304,762 835,727
Other Construction 0 0
Total Construction 352,381 910,302
     
Funding Surplus - 71,464  
Total TIB Funding 328,536 967,604

Local Funding Partners

Funding Amount Percent
LYNDEN 639,068 66.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 639,068 66.0%

Project Description

The travel lanes of Grover Street will be ground 2 inches deep and repaved. The cross-streets at intersections will be ground back approx. 100 feet for a clean transition. New signal loops will be installed at intersections

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.