City of Mesa's 2022 Crack Seal
2-E-928(004)-1
2-E-928(004)-1
2022 Crack Seal
Multiple Locations
FY 2024 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $18,918
County: Franklin | Legislative District: 9 | Project Length: 5.70 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/29/2023
Project Information
Lead Agency | MESA |
Funding Year | 2024 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 5.70 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Alan Rainey |
Contact Email | alan@spinkeng.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/29/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/12/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/30/2023 | 02/27/2023 |
Bid Auth. Approval | 05/01/2023 | 06/21/2023 |
Construction Approval | 08/31/2023 | 09/11/2023 |
Project Closeout | 11/30/2023 | 11/17/2023 |
Audit Date | 11/29/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 30,000 | 18,918 |
Other Construction | 0 | 0 |
Total Construction | 30,000 | 18,918 |
Funding Increase | 3,252 | |
Funding Surplus | - 14,334 | |
Total TIB Funding | 18,918 | 18,918 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MESA | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
City wide crack seal of roads using small works roster.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |