City of Bridgeport's 16th Street Overlay

2-E-851(007)-1

2-E-851(007)-1
16th Street Overlay

Douglas Ave to Fairview Ave

FY 2024 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $225,000

County: Douglas   |   Legislative District: 12   |   Project Length: 0.19   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 11/30/2023

Project Information

Lead Agency BRIDGEPORT
Funding Year 2024
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 0.19 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Stuart Dezellem
Contact Email pwsuper@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 11/30/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 02/16/2023
Bid Auth. Approval 04/15/2023 04/27/2023
Construction Approval 05/18/2023 06/05/2023
Project Closeout 11/01/2023 11/29/2023
Audit Date   11/30/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 34,500 28,361
Right of Way 0 0
Total Design 34,500 28,361
     
Construction Engineering 34,500 15,130
Construction Contract 230,000 181,509
Other Construction 0 0
Total Construction 264,500 196,639
     
Funding Surplus - 74,000  
Total TIB Funding 225,000 225,000

Local Funding Partners

Funding Amount Percent
BRIDGEPORT 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 5.9%

Project Description

Overlay the existing roadway, including subgrade repair where necessary. 16th Street - Douglas Ave to Fairview Ave

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.