Agency |
Project Name |
Termini |
Program |
Fund Series |
Phase |
TIB Funds |
Project Costs |
ABERDEEN |
Sumner Avenue (SR 101) Sidewalk |
Oak St to Williams St |
ATP |
2024 |
Design |
450,000 |
1,141,775 |
ABERDEEN |
US 101 Safety Improvements |
US 101 from the City of Cosmopolis MP 81.73 to the Chehalis River Bridge MP 83.17 |
ATP |
2025 |
Design |
450,000 |
2,205,000 |
AIRWAY HEIGHTS |
10th Avenue Extension |
10th Ave terminus to Hayford Rd |
UAP |
2022 |
Construction |
2,467,406 |
3,799,424 |
AIRWAY HEIGHTS |
6th Avenue |
Craig Rd to Russell St |
UAP |
2025 |
Design |
754,341 |
6,193,341 |
ALBION |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
700,000 |
700,000 |
ALGONA |
Ellingson Road Overlay |
Pacific Ave to UPRR |
SCPP |
2025 |
Design |
678,600 |
754,000 |
ANACORTES |
Commercial Avenue (SR 20 Spur) |
13th St to 11th St |
UAP |
2021 |
Design |
950,000 |
3,525,442 |
ANACORTES |
R Avenue Improvements |
27th St to 34th St |
UAP |
2024 |
Bid Auth |
550,000 |
4,718,218 |
ANACORTES |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
400,000 |
400,000 |
ARLINGTON |
211th Place |
SR 530 to 67th Ave NE |
UAP |
2024 |
Design |
2,300,000 |
2,885,118 |
ASOTIN |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
56,525 |
59,500 |
ASOTIN |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
139,440 |
146,779 |
AUBURN |
Auburn Way S Widening |
Hemlock St to Poplar St |
UAP |
2025 |
Design |
3,309,032 |
7,994,034 |
AUBURN |
Regional Growth Center Improvements |
B St NE and 3rd St NE to Auburn Wy N and 4th St NE |
UAP |
2025 |
Design |
2,112,444 |
3,686,370 |
BAINBRIDGE ISLAND |
NE Wyatt Way |
Eagle Harbor Dr NE |
ATP |
2025 |
Design |
500,000 |
3,928,489 |
BATTLE GROUND |
2024 Eaton Boulevard Overlay |
Multiple Locations |
APP |
2025 |
Design |
487,448 |
609,310 |
BATTLE GROUND |
SE Grace Avenue - Phase II |
NE 1st St to SE Rasmussen Blvd |
UAP |
2023 |
Design |
3,000,000 |
6,310,056 |
BATTLE GROUND |
Complete Streets Award |
March 2019 Selection |
CSP |
2020 |
Construction |
350,000 |
350,000 |
BELLEVUE |
150th Avenue |
SE 28th St to SE 38th St |
UAP |
2024 |
Design |
3,990,000 |
10,966,587 |
BELLEVUE |
123rd Avenue SE pedestrian improvements |
SE 60th Street to Newcastle Way |
CSP |
2026 |
Application |
600,000 |
2,181,014 |
BELLEVUE |
NE 8th Street |
Parcel Frontage at 11635 NE 8th St |
SP |
2023 |
Design |
354,480 |
547,735 |
BELLINGHAM |
Meridian St |
W Illinois St Roundabout |
UAP |
2022 |
Construction |
575,000 |
1,105,689 |
BELLINGHAM |
Lincoln St/E Maple Street |
Lincoln St to Consolidation Ave |
UAP |
2023 |
Construction |
480,000 |
650,000 |
BELLINGHAM |
12th Street and Finnegan Way |
McKenzie St and 11th St |
UAP |
2024 |
Design |
400,000 |
500,000 |
BELLINGHAM |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
500,000 |
500,000 |
BENTON CITY |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
299,597 |
315,365 |
BLAINE |
Boblett Street |
Yew Ave to Ludwick Ave |
UAP |
2022 |
Design |
1,161,862 |
3,190,964 |
BOTHELL |
Meridian Avenue Roundabout |
240th St Roundabout |
UAP |
2025 |
Bid Auth |
800,000 |
2,075,242 |
BREMERTON |
E 11th Street and Perry Avenue |
Pitt Avenue to E 17th Street |
UAP |
2020 |
Construction |
4,341,916 |
7,287,140 |
BREMERTON |
Washington Avenue / 11th Street |
Pacific Ave to Manette Bridge |
UAP |
2023 |
Construction |
1,742,143 |
7,260,650 |
BREMERTON |
Wheaton Way and E 11th Street Sidewalk |
Wheaton Way and E 11th St Nipsic Ave to Trenton Ave |
SP |
2023 |
Construction |
106,400 |
140,000 |
BREWSTER |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Construction |
12,974 |
13,657 |
BREWSTER |
Old Hwy 97 |
US 97 to North C/L |
SCAP |
2024 |
Construction |
169,288 |
1,419,776 |
BRIER |
2022 Overlay Award |
Multiple Locations |
APP |
2024 |
Design |
1,045,500 |
1,230,000 |
BUCKLEY |
Hinkleman Road Rehabilitation |
Hinkleman Ext to 28307 Hinkleman Rd |
APP |
2023 |
Construction |
278,472 |
333,585 |
BUCKLEY |
Foothills Trail Crossing |
Main St |
ATP |
2024 |
Construction |
219,276 |
274,113 |
BURIEN |
S 136th Street |
1st Ave S to Des Moines Memorial Dr S |
UAP |
2023 |
Construction |
4,121,540 |
5,857,312 |
BURIEN |
SW 148th Street |
4th Ave SW to 6th Ave SW |
UAP |
2024 |
Design |
3,932,160 |
4,915,200 |
BURLINGTON |
2024 Overlay |
Multiple Locations |
APP |
2025 |
Design |
671,500 |
790,000 |
BURLINGTON |
East-West Connector |
Burlington Blvd to Walnut Street |
UAP |
2019 |
Construction |
2,688,618 |
5,626,051 |
BURLINGTON |
LED Streetlight Conversion |
PSE Owned |
LED |
2019 |
Construction |
150,000 |
150,000 |
CAMAS |
NW 38th Avenue |
NW Parker St to Grass Valley Park |
UAP |
2025 |
Bid Auth |
1,692,384 |
6,736,683 |
CARBONADO |
7th Street Sidewalk |
OFerrell Dr to Wingate Dr |
ATP |
2024 |
Construction |
179,482 |
188,928 |
CARNATION |
2021 Overlay |
Multiple Locations |
SCPP |
2023 |
Construction |
190,906 |
228,409 |
CARNATION |
2024 Seal Coat |
Multiple Locations |
SCPP |
2025 |
Design |
154,000 |
162,850 |
CARNATION |
Milwaukee Avenue Overlay |
Entwistle St to NE 50th St |
SCPP |
2025 |
Design |
467,444 |
492,046 |
CARNATION |
E Bird Street |
E Commercial St to Milwaukee Ave |
SCAP |
2024 |
Construction |
546,400 |
642,824 |
CARNATION |
McKinley Street |
Eugene St to Blanche St |
SCAP |
2024 |
Construction |
459,422 |
839,209 |
CASHMERE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
220,281 |
231,875 |
CASHMERE |
Sunset Highway |
City Limits to Mill Site |
SCAP |
2023 |
Construction |
250,000 |
1,636,627 |
CASTLE ROCK |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
47,500 |
50,000 |
CENTRALIA |
Galvin Street Overlay |
Harrison Ave to Chehalis River Bridge |
APP |
2024 |
Construction |
829,784 |
1,033,017 |
CENTRALIA |
S Gold Street |
Main St to Summa St |
UAP |
2024 |
Design |
1,194,902 |
1,405,768 |
CHEHALIS |
2024 National Avenue Overlay |
NE Washington Ave to NW Chamber of Commerce Way |
APP |
2025 |
Design |
623,700 |
693,000 |
CHEHALIS |
SW 13th Street Sidewalk |
SW William Ave to S Market Blvd |
ATP |
2025 |
Design |
269,100 |
299,000 |
CHELAN |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
41,687 |
46,319 |
CHELAN |
Sanders Street Pedestrian Improvements |
E Okanogan Ave and E Wapato Ave |
SCAP |
2025 |
Design |
99,999 |
819,759 |
CHELAN |
Lakeside Trail |
W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave. |
ATP |
2025 |
Design |
500,000 |
3,602,414 |
CHELAN |
Resin Bonded Stone Surfacing Pilot |
Bradley and Johnson Intersection Vicinity |
ATP |
2025 |
Design |
163,800 |
182,000 |
CHELAN COUNTY |
Easy St and School St Intersection |
School Street Roundabout |
UAP |
2025 |
Design |
800,000 |
2,431,217 |
CHENEY |
Elm Street Overlay |
6th Street Vicinity to Washington Street |
APP |
2025 |
Design |
1,884,892 |
2,094,324 |
CHENEY |
N 6th Street Roundabout |
Betz Road |
UAP |
2024 |
Design |
966,854 |
1,074,283 |
CHEWELAH |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
54,587 |
57,460 |
CHEWELAH |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
171,732 |
180,771 |
CHEWELAH |
W Main Avenue |
SR 395 to Hunt St |
SCAP |
2024 |
Design |
1,117,660 |
1,189,000 |
CLARK COUNTY |
NE 99th Street |
NE 94th Ave to vicinity of NE 117th Ave (SR 503) |
UAP |
2022 |
Construction |
3,150,000 |
16,640,330 |
CLARK COUNTY |
NE 152nd Avenue |
Padden Pkwy to NE 99th St |
UAP |
2025 |
Design |
3,500,000 |
8,967,367 |
CLARK COUNTY |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
750,000 |
750,000 |
CLARK COUNTY |
NE Hazel Dell Avenue |
NE 99th St to NE 117th St |
SP |
2021 |
Construction |
300,000 |
1,795,000 |
CLARK COUNTY |
NE 68th Street Sidewalk |
Highway 99 to NE St Johns Rd |
SP |
2023 |
Construction |
400,000 |
5,680,037 |
CLARK COUNTY |
Truman School Sidewalk |
NE 40th Ave and NE 44th St |
ATP |
2024 |
Design |
200,000 |
430,000 |
CLE ELUM |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Design |
41,799 |
43,999 |
CLE ELUM |
First Street |
Pennsylvania Ave to Harris Ave |
SCAP |
2024 |
Construction |
718,849 |
1,096,846 |
CLE ELUM |
Second Street Roundabout |
Second St (SR 903) and Stafford Ave |
SCAP |
2024 |
Design |
704,591 |
741,675 |
CLE ELUM |
First Street - Phase 3 |
Oakes Ave to Peoh Ave |
SCAP |
2025 |
Construction |
677,032 |
5,499,790 |
CLE ELUM |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
350,000 |
350,000 |
CLE ELUM |
2nd Street multi-use path |
Pennsylvania Avenue toward Short Avenue |
CSP |
2026 |
Application |
500,000 |
526,316 |
CLE ELUM |
Second Street Pathway - Phase 1 |
N Stafford Ave to N Pennsylvania Ave |
ATP |
2025 |
Design |
497,767 |
523,965 |
CLYDE HILL |
2024 Overlay |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
150,000 |
200,527 |
COLFAX |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
140,000 |
147,368 |
COLFAX |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
2,000,000 |
2,105,263 |
COLFAX |
Morton and Sumner Streets |
Morton Tyler to 4th Sumner 1st to 4th |
SCAP |
2024 |
Bid Auth |
1,286,252 |
1,353,950 |
COLLEGE PLACE |
NE Damson Avenue |
Cargill Ave to Rose St |
UAP |
2024 |
Bid Auth |
1,126,706 |
1,251,896 |
COLLEGE PLACE |
SW Mojonnier Road Improvements |
College Ave to Bluvue Ln |
UAP |
2025 |
Design |
1,922,008 |
6,772,008 |
COLLEGE PLACE |
NE Rose Street Pedestrian Lights |
NE Carey Court to NE Ash Avenue |
CSP |
2026 |
Application |
487,160 |
541,290 |
COLLEGE PLACE |
SE 8th Street Sidewalk |
Birch Ave to Larch Ave |
ATP |
2025 |
Design |
657,900 |
731,000 |
COLTON |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
252,037 |
252,037 |
COLVILLE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
77,273 |
81,340 |
CONCONULLY |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
114,500 |
114,500 |
CONCRETE |
Secondary Access |
SR 20 to Airport Way |
SCAP |
2023 |
Design |
500,000 |
3,414,000 |
CONNELL |
2024 Chip Seal |
W Clark Street |
SCPP |
2025 |
Bid Auth |
154,329 |
162,452 |
CONNELL |
School zone and speed feedback signs |
Cemetary Road to 5th Avenue |
CSP |
2026 |
Application |
95,000 |
100,000 |
COSMOPOLIS |
LED Streetlight Conversion |
City Owned |
LED |
2024 |
Construction |
28,670 |
28,670 |
COULEE CITY |
Walnut Street Overlay |
4th St to Mc Entee St |
SCAP |
2024 |
Construction |
58,736 |
438,074 |
COULEE CITY |
McEntee Street Improvements |
Walnut St to Chelan St |
SCAP |
2025 |
Design |
124,201 |
920,000 |
COULEE DAM |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
546,185 |
546,185 |
COULEE DAM |
ADA Ramp Upgrades |
Multiple Locations |
ATP |
2025 |
Design |
481,406 |
481,406 |
COUPEVILLE |
2022 Overlay Award |
Multiple Locations |
SCPP |
2024 |
Closeout |
241,750 |
254,473 |
COUPEVILLE |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
141,598 |
149,051 |
COUPEVILLE |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
182,685 |
192,299 |
COUPEVILLE |
Front and N Main Street Sidewalks |
Multiple Locations |
ATP |
2024 |
Design |
325,123 |
871,514 |
COVINGTON |
Lakepointe Boulevard |
SR 18 to SE 258th St |
UAP |
2021 |
Construction |
994,019 |
1,362,939 |
DAVENPORT |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
237,729 |
237,729 |
DAYTON |
FY 2022 Overlay Project |
Multiple Locations |
SCPP |
2022 |
Construction |
445,185 |
522,450 |
DAYTON |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
2,000,000 |
2,105,263 |
DAYTON |
N 3rd Street |
Main St to Dayton Ave |
SCAP |
2023 |
Construction |
1,593,941 |
1,682,833 |
DAYTON |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
80,000 |
80,000 |
DAYTON |
S. 4th Street sidewalk |
E Main Street to Mustard Street |
CSP |
2026 |
Application |
696,350 |
733,000 |
DES MOINES |
24th Avenue S |
Kent-Des Moines Rd (SR 516) to S 223rd St |
UAP |
2021 |
Construction |
4,212,947 |
7,493,224 |
DOUGLAS COUNTY |
21st St NE |
N Baker Ave to N Devon Ave |
UAP |
2025 |
Design |
1,518,791 |
1,786,813 |
DUPONT |
LED Streetlight Conversion |
PSE Owned |
LED |
2021 |
Construction |
11,550 |
11,550 |
DUVALL |
NE 150th Street Overlay |
275th Ave NE to 280th Pl NE |
APP |
2025 |
Design |
403,750 |
475,000 |
DUVALL |
142nd Place sidewalk - Phase 2 |
275th Avenue NE to 278th Avenue NE |
CSP |
2026 |
Application |
400,000 |
674,000 |
DUVALL |
Main Street (SR 203) / Cherry Street RRFB |
NE Cherry St Crossing |
ATP |
2025 |
Bid Auth |
67,830 |
79,800 |
EAST WENATCHEE |
2022 Overlay Award |
McGee St SE to Grant Rd |
APP |
2024 |
Construction |
402,239 |
499,017 |
EAST WENATCHEE |
3rd Street SE |
Rock Island Rd Intersection |
UAP |
2023 |
Construction |
805,588 |
1,447,705 |
EAST WENATCHEE |
19th Street NW Phase 1 |
SR 28 to Bella Rio Apartments |
UAP |
2024 |
Bid Auth |
2,000,000 |
4,558,136 |
EAST WENATCHEE |
5th Street NE Safety and Multimodal Improvements |
N Baker Ave to N Kentucky Ave |
UAP |
2025 |
Design |
2,500,000 |
2,995,175 |
EAST WENATCHEE |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
300,000 |
300,000 |
EATONVILLE |
Eatonville Pavement Preservation |
Multiple Locations |
SCPP |
2025 |
Design |
130,720 |
137,600 |
EATONVILLE |
View Crest Drive and Center Street |
Center St W to Dow Ridge Dr |
SCAP |
2024 |
Construction |
336,912 |
363,021 |
EATONVILLE |
Washington Avenue North (SR 161) |
Lynch Creek Rd E to 250 ft N of Center St E |
SCAP |
2021 |
Construction |
155,125 |
3,277,132 |
EATONVILLE |
West Eatonville Sidewalk Improvements |
Multiple Locations |
ATP |
2025 |
Design |
399,076 |
420,080 |
EDMONDS |
Main Street complete streets improvements |
6th Avenue to 8th Avenue |
CSP |
2026 |
Application |
391,215 |
1,328,715 |
ELECTRIC CITY |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Design |
335,054 |
335,054 |
ELECTRIC CITY |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
155,000 |
155,000 |
ELLENSBURG |
Pfenning Road Sidewalk |
240ft n/o Vantage Hwy to Radio Rd |
UAP |
2024 |
Design |
1,390,000 |
2,138,500 |
ELLENSBURG |
Pedestrian Improvements |
Multiple Locations |
CSP |
2026 |
Application |
500,000 |
588,235 |
ELMA |
2024 Red Town Initiative |
Multiple Locations |
SCPP |
2025 |
Design |
950,000 |
1,000,000 |
ELMA |
W Main Street ADA |
16th St to 18th St |
ATP |
2025 |
Design |
434,720 |
457,600 |
ELMA |
Main Street RRFBs |
4th St to 11th St |
ATP |
2025 |
Design |
231,800 |
244,000 |
ENDICOTT |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Design |
31,690 |
31,690 |
ENTIAT |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Construction |
76,190 |
80,200 |
ENUMCLAW |
2024 Overlay |
Multiple Locations |
APP |
2025 |
Construction |
264,458 |
311,128 |
ENUMCLAW |
244th Avenue Roundabout |
Roosevelt Ave |
UAP |
2024 |
Construction |
641,728 |
1,131,577 |
ENUMCLAW |
In Fill Sidewalk |
Various gaps |
ATP |
2024 |
Construction |
380,504 |
504,623 |
EPHRATA |
Nat Washington Way Overlay |
A Street SE to 2nd Ave SE |
APP |
2024 |
Design |
563,134 |
625,705 |
EVERSON |
S Harkness Street |
W Main St to Lincoln St |
SCAP |
2025 |
Design |
683,671 |
719,654 |
FAIRFIELD |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Design |
19,800 |
19,800 |
FAIRFIELD |
2024 Scrub Seal |
Multiple Locations |
SCPP |
2025 |
Design |
111,514 |
111,514 |
FARMINGTON |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
650,000 |
650,000 |
FEDERAL WAY |
S 288th Street |
16th Ave S to 34th Ave S |
UAP |
2022 |
Design |
2,000,000 |
3,240,000 |
FEDERAL WAY |
Pacific Highway S (SR 99) |
S C/L to Weigh Station |
UAP |
2023 |
Design |
2,500,000 |
3,770,000 |
FEDERAL WAY |
SR 99 pedestrian improvements |
S 304th Street to S 308th Street |
CSP |
2026 |
Application |
120,800 |
151,000 |
FEDERAL WAY |
Citywide Pedestrian Crossings |
RRFB Crossings |
ATP |
2024 |
Design |
350,001 |
503,211 |
FERNDALE |
Thornton Street |
Malloy Avenue to 2nd Avenue Roundabout |
UAP |
2020 |
Construction |
2,495,394 |
23,013,259 |
FERNDALE |
Ferndale Terrace |
Hendrickson Ave to Vista Dr |
UAP |
2025 |
Design |
2,855,316 |
5,988,666 |
FIFE |
N Levee Road Overlay |
70th Ave E to Freeman Rd E |
APP |
2024 |
Construction |
587,941 |
804,318 |
FIFE |
20th Street E Multimodal Improvements |
5410 20th St E to 62nd Ave E |
UAP |
2025 |
Design |
3,990,000 |
4,988,816 |
FIRCREST |
2022 Overlay Award |
Multiple Locations |
APP |
2024 |
Design |
678,470 |
753,856 |
FIRCREST |
2024 Overlay |
Multiple Locations |
APP |
2025 |
Design |
677,409 |
801,952 |
FORKS |
West E Street |
5th Ave to S Forks Ave (SR 101) |
SCAP |
2025 |
Design |
549,613 |
578,540 |
FRIDAY HARBOR |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
99,324 |
110,360 |
FRIDAY HARBOR |
Marguerite Place |
Spring St to Park St |
SCAP |
2023 |
Design |
800,000 |
1,565,314 |
GEORGE |
2022 Overlay Award |
Washington Wy to E Deacon St |
SCPP |
2024 |
Construction |
420,770 |
420,770 |
GEORGE |
2022 Crack Seal |
Multiple Locations |
SCPP |
2024 |
Construction |
20,655 |
20,655 |
GEORGE |
Washington Way N |
Richmond Ave to Frontage Rd |
SCAP |
2023 |
Construction |
987,057 |
1,039,007 |
GIG HARBOR |
Wollochet Drive Signal |
Wagner Way |
UAP |
2025 |
Bid Auth |
1,067,000 |
1,334,360 |
GIG HARBOR |
Burnham Drive Sidewalk |
Eagles Club Driveway to 96th St |
ATP |
2025 |
Design |
1,524,574 |
4,731,669 |
GOLD BAR |
9th Street Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
191,150 |
201,140 |
GOLD BAR |
2024 Seal Coat |
Multiple Locations |
SCPP |
2025 |
Design |
158,500 |
166,760 |
GRAND COULEE |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Design |
78,980 |
78,980 |
GRAND COULEE |
2022 Crack Seal |
Citywide |
SCPP |
2024 |
Construction |
84,280 |
84,280 |
GRAND COULEE |
James Saunder Street and Fortuyn Road |
Burdin Blvd to 2nd St |
SCAP |
2024 |
Bid Auth |
800,000 |
800,000 |
GRAND COULEE |
Spokane Way Improvements |
Alcan Rd to E Grand Coulee Ave (SR 174) |
SCAP |
2025 |
Design |
126,876 |
1,015,000 |
GRANDVIEW |
Wine Country Road Overlay |
Euclid St to Grandridge Rd |
APP |
2025 |
Design |
470,790 |
523,100 |
GRANDVIEW |
Wine Country Road |
McCreadie Rd Intersection |
UAP |
2023 |
Construction |
1,582,684 |
1,775,353 |
GRANGER |
Main Street Phase 1 |
1st St to 2nd St |
SCAP |
2023 |
Construction |
1,061,439 |
1,268,144 |
GRANITE FALLS |
Alpine Street Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
232,600 |
261,900 |
GRANITE FALLS |
Galena Street Extension |
Stanley St to Portage Ave |
SCAP |
2023 |
Construction |
690,000 |
2,293,458 |
GRANITE FALLS |
W Stanley Street Sidewalk |
Jordan Rd to Prospect Ave |
ATP |
2024 |
Design |
496,400 |
522,600 |
HARTLINE |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
133,667 |
133,667 |
HATTON |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
450,000 |
450,000 |
HOQUIAM |
City of Hoquiam Safe Routes to School |
City of Hoquiam |
ATP |
2024 |
Design |
361,000 |
1,801,000 |
ISSAQUAH |
12th Avenue NW |
SR 900 to Lake Dr |
UAP |
2023 |
Construction |
3,000,000 |
5,904,859 |
KALAMA |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
165,300 |
174,000 |
KALAMA |
China Garden Road |
S 10th St to Gwynne Rd |
SCAP |
2025 |
Design |
858,069 |
903,230 |
KALAMA |
LED Streetlight Conversion |
PUD Owned |
LED |
2024 |
Construction |
33,623 |
33,623 |
KELSO |
LED Streetlight Conversion |
PUD Owned |
LED |
2024 |
Construction |
145,589 |
145,589 |
KENMORE |
73rd Avenue NE |
NE 181st St and NE 192nd St |
UAP |
2024 |
Construction |
920,000 |
1,650,135 |
KENMORE |
NE 170 Street ped/bike improvements |
Juanita Drive to 72nd Avenue NE |
CSP |
2026 |
Application |
185,120 |
231,400 |
KENNEWICK |
Columbia Center Boulevard |
Deschutes Ave Intersection |
UAP |
2023 |
Construction |
1,472,000 |
2,395,667 |
KENNEWICK |
Citywide ADA Improvements |
Multiple Locations |
CSP |
2026 |
Application |
327,790 |
409,745 |
KENT |
Reith Road |
140ft s/o S 253rd St to 200ft w/o SR 516 |
UAP |
2023 |
Bid Auth |
1,595,000 |
2,492,795 |
KENT |
76th Avenue S South Phase |
2600ft s/o S 212th St to 3660 ft s/o S 212th St |
UAP |
2025 |
Construction |
2,654,664 |
15,224,824 |
KENT |
132nd Avenue SE multi-use path |
SE 228th Place to SE 240th Street |
CSP |
2026 |
Application |
500,000 |
1,755,000 |
KENT |
RRFB Crossings |
Various |
ATP |
2025 |
Design |
104,461 |
139,999 |
KETTLE FALLS |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
89,825 |
95,102 |
KING COUNTY |
68th Avenue S / S 124th Street |
Renton Ave S to Campbell Hill Elem Sch, 6418 S 124th St |
UAP |
2023 |
Design |
1,706,037 |
2,132,547 |
KING COUNTY |
Redmond Ridge Dr NE Roundabout |
NE Alder Crest Dr |
UAP |
2024 |
Construction |
907,859 |
1,723,869 |
KIRKLAND |
100th Avenue NE |
NE 138th Pl to NE 145th St |
UAP |
2021 |
Construction |
3,300,000 |
21,430,791 |
KIRKLAND |
116th Avenue NE sidewalk improvements |
NE 73rd Street to NE 75th Street |
CSP |
2026 |
Application |
500,000 |
871,383 |
KIRKLAND |
RRFB project |
Crosswalk at 124th Ave NE and NE 104th Street |
CSP |
2026 |
Application |
104,800 |
133,355 |
KIRKLAND |
132nd Avenue NE |
NE 110th Pl to NE 97th St |
SP |
2023 |
Design |
125,001 |
483,590 |
KIRKLAND |
Pedestrian Crossing at Lake Washington Institute of Technology |
132nd Ave NE |
ATP |
2025 |
Design |
265,000 |
351,700 |
KITSAP COUNTY |
Greaves Way |
Old Frontier Rd Roundabout |
UAP |
2021 |
Construction |
1,422,550 |
2,308,242 |
KITSAP COUNTY |
SE Lund Avenue |
Harris Rd SE Intersection |
UAP |
2023 |
Design |
3,664,358 |
4,585,448 |
KITSAP COUNTY |
Lund Avenue Roundabout |
Chase Rd Roundabout |
UAP |
2025 |
Design |
2,668,198 |
3,335,249 |
KITTITAS |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
22,835 |
24,036 |
KITTITAS |
E 1st Avenue |
Main St to East C/L |
SCAP |
2020 |
Construction |
87,751 |
650,002 |
LA CONNER |
Pedestrian Improvements |
Multiple Locations |
CSP |
2026 |
Application |
240,000 |
274,900 |
LACEY |
College Street NE |
Martin Way to 15th Ave NE |
UAP |
2022 |
Design |
2,830,000 |
4,800,000 |
LACROSSE |
Main Avenue and 2nd Street Sidewalk |
2nd Street from Main Ave to Crystal Ave |
SP |
2023 |
Bid Auth |
691,742 |
691,742 |
LAKE FOREST PARK |
SR 104 |
40th Pl NE Roundabout |
UAP |
2021 |
Design |
2,561,198 |
3,240,000 |
LAKE STEVENS |
91st Avenue SE / 24th Street SE / S Lake Stevens Road |
21st St SE to W leg of SR 9 Roundabout |
UAP |
2022 |
Construction |
3,000,000 |
12,843,514 |
LAKEWOOD |
Washington Boulevard / Edgewood Avenue / North Gate Road |
W C/L to Interlaaken Dr |
UAP |
2023 |
Construction |
3,784,273 |
9,705,998 |
LAKEWOOD |
S Tacoma Way Signal |
92nd St S |
UAP |
2025 |
Design |
750,000 |
1,250,000 |
LAKEWOOD |
Custer Road W |
Bridgeport Way SW to 75th ST W |
UAP |
2025 |
Design |
2,976,687 |
3,720,858 |
LAKEWOOD |
Steilacoom Boulevard SW Sidewalk |
87th Ave SW to Weller Rd SW |
SP |
2023 |
Bid Auth |
442,680 |
4,963,000 |
LAKEWOOD |
Union Avenue SW Sidewalk |
200 ft s/o Orchard St SW to Spruce St SW |
ATP |
2024 |
Closeout |
475,158 |
996,812 |
LANGLEY |
Saratoga Road |
De Bruyn Ave to W C/L |
SCAP |
2025 |
Design |
540,000 |
568,670 |
LEAVENWORTH |
2024 Scrub Seal - Red Town InitiativeIncre |
Multiple Locations |
SCPP |
2024 |
Bid Auth |
1,575,000 |
1,750,000 |
LEAVENWORTH |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
90,000 |
100,000 |
LEAVENWORTH |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
75,000 |
75,000 |
LEAVENWORTH |
Ski Hill Drive Sidewalk |
Evans St and SR 2 |
SP |
2023 |
Construction |
383,965 |
535,859 |
LEAVENWORTH |
Curb Ramp Improvements |
Multiple Locations |
ATP |
2025 |
Design |
277,992 |
308,880 |
LIND |
2024 Scrub Seal |
Multiple Locations |
SCPP |
2025 |
Design |
128,471 |
128,471 |
LONG BEACH |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
75,000 |
75,000 |
LONG BEACH |
2nd Street NE Sidewalk |
Washington Ave S to 600ft e/o Washington Ave S |
ATP |
2025 |
Design |
336,300 |
354,000 |
LONGVIEW |
46th Avenue |
SR 4 to Olympia Way |
UAP |
2021 |
Construction |
3,331,544 |
5,919,825 |
LONGVIEW |
Olympia Way and Nichols Blvd |
Multiple Locations |
UAP |
2025 |
Design |
2,606,400 |
3,258,000 |
LONGVIEW |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
400,000 |
400,000 |
LONGVIEW |
18th Avenue ADA Ramps |
Louisiana Street to Olympia Way |
CSP |
2026 |
Application |
213,000 |
275,000 |
LYNDEN |
2024 1st Street Overlay |
Riverview Rd to Grover St |
APP |
2025 |
Design |
779,306 |
974,132 |
LYNNWOOD |
Poplar Way Bridge |
196th St SW to Alderwood Mall Blvd |
UAP |
2024 |
Design |
5,000,000 |
42,085,000 |
MABTON |
2022 Crack Seal |
Multiple Locations |
SCPP |
2024 |
Design |
105,510 |
105,510 |
MABTON |
Main Street Reconstruction Project |
Washington St to SR 22 |
SCAP |
2022 |
Construction |
295,963 |
2,381,514 |
MABTON |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
75,000 |
75,000 |
MALDEN |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Design |
15,000 |
15,000 |
MANSFIELD |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
127,825 |
127,825 |
MAPLE VALLEY |
Maple Valley Highway (SR 169) |
SE 253rd Pl to SE 260th St |
UAP |
2024 |
Design |
3,500,000 |
20,220,000 |
MAPLE VALLEY |
Crosswalk safety RRFB |
Multiple Locations |
CSP |
2026 |
Application |
334,080 |
417,600 |
MAPLE VALLEY |
SE Kent Kangley Road (SR 516) Sidewalk |
800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE |
ATP |
2025 |
Design |
742,383 |
927,980 |
MARYSVILLE |
State Avenue |
104th Pl NE to 116th St NE |
UAP |
2022 |
Construction |
4,250,000 |
8,583,489 |
MARYSVILLE |
156th Street NE |
Smokey Pt Blvd to Hayho Creek |
UAP |
2025 |
Design |
1,440,000 |
1,800,000 |
MARYSVILLE |
Citywide ADA Ramps |
Multiple Locations |
CSP |
2026 |
Application |
460,300 |
5,631,455 |
MARYSVILLE |
RRFB project |
Multiple locations |
CSP |
2026 |
Application |
47,740 |
62,267 |
MARYSVILLE |
53rd Ave NE Shared Used Path |
61st St NE to SR 528 |
ATP |
2024 |
Bid Auth |
320,000 |
412,000 |
MATTAWA |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
100,000 |
100,000 |
MCCLEARY |
W Maple Street Sidewalk |
S 6th St to S Main St |
ATP |
2025 |
Design |
495,843 |
521,940 |
MEDICAL LAKE |
2022 Maintenance Project |
Multiple Locations |
SCPP |
2024 |
Construction |
312,528 |
328,976 |
MEDICAL LAKE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
43,560 |
45,853 |
MEDICAL LAKE |
2024 Scrub and Chip Seal - Red Town |
Multiple Locations |
SCPP |
2025 |
Design |
702,129 |
739,082 |
MEDICAL LAKE |
Barker Street |
Lefevre St (SR 902) to Stanley St |
UAP |
2023 |
Construction |
750,841 |
834,268 |
MEDICAL LAKE |
Lefevre Street (SR 902) Ped/Bike Improvements |
Hancock Street North to Brooks Road |
CSP |
2026 |
Application |
1,586,720 |
1,688,000 |
MEDICAL LAKE |
Lefevre Street Restriping and Sidewalk |
Idaho St to n/o James St |
ATP |
2024 |
Design |
639,400 |
695,000 |
MEDINA |
Upland Road Overlay |
Overlake Drive W to NE 6th St |
SCPP |
2024 |
Construction |
233,351 |
264,279 |
MEDINA |
2024 Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
138,744 |
154,160 |
MEDINA |
NE 24th Street ADA Upgrade |
Evergreen Point Rd to 84th Ave |
ATP |
2025 |
Design |
270,270 |
300,300 |
MESA |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
454,604 |
454,604 |
MILLWOOD |
Argonne Road Reconstruction - Phase 2 |
E Trent Ave to 150 ft s/o S Frederick Ave |
SCAP |
2025 |
Design |
1,409,230 |
1,483,400 |
MILLWOOD |
Argonne Road Reconstruction - Phase 1 |
150 ft s/o Frederick to N of Riverway |
SCAP |
2025 |
Design |
1,278,255 |
4,448,347 |
MILTON |
2022 Overlay Award |
Multiple Locations |
APP |
2024 |
Design |
485,760 |
571,488 |
MILTON |
Pacific Highway S (SR 99) |
Porter Way Intersection |
UAP |
2021 |
Construction |
3,380,530 |
3,980,616 |
MONROE |
2022 Overlay Award |
Multiple Locations |
APP |
2024 |
Design |
798,445 |
1,140,637 |
MONROE |
RRFB Crossings |
City of Monroe |
ATP |
2025 |
Design |
228,900 |
298,000 |
MONTESANO |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Design |
64,600 |
68,000 |
MONTESANO |
2024 W Pioneer Avenue Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
340,000 |
362,400 |
MONTESANO |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Design |
216,000 |
230,700 |
MONTESANO |
W. Pioneer Avenue |
Main to 4th |
SCAP |
2024 |
Bid Auth |
189,000 |
1,897,100 |
MORTON |
2024 Red Town Initiative |
Multiple Locations |
SCPP |
2025 |
Design |
1,092,500 |
1,150,000 |
MORTON |
2022 Overlay Award |
City Wide |
SCAP |
2024 |
Design |
463,420 |
635,000 |
MOSES LAKE |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
105,000 |
105,000 |
MOUNT VERNON |
Laventure Road |
Hoag Rd to Sigmar Ln |
UAP |
2025 |
Design |
1,208,800 |
1,536,000 |
MOUNTLAKE TERRACE |
66th Avenue W |
220th St SW to N City Limits |
UAP |
2021 |
Construction |
2,503,000 |
3,433,637 |
MOUNTLAKE TERRACE |
56th Avenue W |
170ft n/o 236th St SW to 475ft n/o 230th St SW |
UAP |
2024 |
Design |
5,000,000 |
18,537,805 |
MOXEE |
Pedestrian Improvements |
Multiple Locations |
CSP |
2026 |
Application |
447,759 |
497,510 |
MUKILTEO |
Harbour Pointe Blvd. paved path |
47th Place Way to Cyrus Way |
CSP |
2026 |
Application |
500,000 |
1,228,207 |
NACHES |
Downtown Revitalization Plan |
W 2nd Street to W 3rd Street |
CSP |
2026 |
Application |
71,250 |
75,000 |
NAPAVINE |
2nd Ave SE Overlay |
Washington St to RR tracks |
SCPP |
2025 |
Design |
183,509 |
193,168 |
NEWPORT |
2024 Chip Seal |
Multiple Locations |
SCPP |
2026 |
Application |
125,000 |
131,579 |
NORMANDY PARK |
1st Avenue Sidewalk |
S 174th St to SW 176th St |
SP |
2023 |
Construction |
505,840 |
728,000 |
NORTH BEND |
North Bend Way Overlay |
8th S to W C/L |
APP |
2023 |
Construction |
601,921 |
723,128 |
NORTH BEND |
2024 Overlay |
Multiple Locations |
APP |
2025 |
Design |
974,497 |
1,146,466 |
NORTH BEND |
Sidewalk gaps |
Multiple Locations |
CSP |
2026 |
Application |
500,000 |
1,437,500 |
NORTH BEND |
SR202 Sidewalk Gap |
North Bend Way to RR Tracks |
ATP |
2025 |
Design |
133,819 |
157,435 |
NORTH BONNEVILLE |
Cascade Drive and Hot Springs Way |
Varies |
SCAP |
2025 |
Design |
299,958 |
315,746 |
OAK HARBOR |
W Whidbey Avenue Overlay |
SW Jib St to Oak Harbor St |
APP |
2024 |
Construction |
420,385 |
494,571 |
OAK HARBOR |
NE 7th Avenue |
e/o Oak Harbor St to Harvest Dr |
UAP |
2024 |
Bid Auth |
837,185 |
2,040,000 |
OAK HARBOR |
LED Streetlight Conversion |
PSE Owned |
LED |
2019 |
Construction |
220,000 |
220,000 |
OAKVILLE |
2024 Red Town Initiative |
Multiple Locations |
SCPP |
2025 |
Design |
500,000 |
500,000 |
OAKVILLE |
School Street and W Pine Street |
SR 12 to Ash St and SR 12 to School St |
SCAP |
2024 |
Design |
638,743 |
638,743 |
OCEAN SHORES |
Point Brown Pedestrian Crossing |
Between Chance a La Mer and Shoal St |
SP |
2023 |
Construction |
169,720 |
259,292 |
ODESSA |
2024 Maintenance Project |
Multiple Locations |
SCPP |
2025 |
Design |
190,630 |
190,630 |
OKANOGAN |
2023 Maintenance Project |
Citywide |
SCPP |
2024 |
Construction |
200,884 |
211,457 |
OKANOGAN |
3rd Avenue Improvements |
Irene St to Greta St |
SCAP |
2025 |
Design |
1,235,000 |
1,300,000 |
OKANOGAN |
Oak Street |
2nd Ave to Bridge e/o 1st Ave |
SCAP |
2023 |
Construction |
66,591 |
503,263 |
OLYMPIA |
Fones Road SE |
Pacific Ave SE to 18th Ave SE |
UAP |
2023 |
Design |
2,000,000 |
14,215,487 |
OLYMPIA |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
300,000 |
300,000 |
OMAK |
2022 Chip Seal Award |
Multiple Locations |
SCPP |
2024 |
Design |
87,495 |
92,100 |
OMAK |
2023 Maintenance Project |
Citywide |
SCPP |
2024 |
Construction |
243,615 |
256,437 |
OMAK |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
61,429 |
64,662 |
OMAK |
Jonathan Avenue |
Pine St to Quince St |
SCAP |
2025 |
Design |
792,300 |
834,000 |
OMAK |
Central Ave Reconstruction Phase II |
Cedar St to Fir St |
SCAP |
2025 |
Design |
940,405 |
989,900 |
OMAK |
Engh Road |
Omache Dr to Omak River Rd |
SCAP |
2020 |
Construction |
148,450 |
1,099,632 |
OROVILLE |
2021 Seal Coat |
Multiple Locations |
SCPP |
2023 |
Construction |
251,574 |
264,815 |
OROVILLE |
Ironwood Street |
12th Ave to 17th Ave |
SCAP |
2024 |
Bid Auth |
1,195,480 |
1,258,400 |
OROVILLE |
Central Avenue W |
W C/L to Main St (SR 97) |
SCAP |
2020 |
Construction |
73,827 |
546,865 |
ORTING |
Kansas Street Reconstruction |
SR 162 to Coe Ln |
UAP |
2025 |
Design |
4,420,363 |
4,911,515 |
OTHELLO |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
400,000 |
400,000 |
PACIFIC |
Ellingson Overlay |
West Valley Hwy to UPRR Crossing |
APP |
2025 |
Design |
1,607,270 |
1,786,103 |
PACIFIC |
Stewart Road (8th Street East) |
Valentine Avenue to Butte Avenue |
UAP |
2019 |
Construction |
4,877,200 |
6,601,970 |
PACIFIC |
New sidewalks |
Multiple Locations |
CSP |
2026 |
Application |
539,750 |
635,000 |
PACIFIC |
Interurban Trail Crossing Improvements |
Ellingson Rd |
ATP |
2025 |
Design |
79,240 |
88,044 |
PACIFIC |
LED Streetlight Conversion |
PSE Owned |
LED |
2020 |
Construction |
110,250 |
110,250 |
PALOUSE |
Complete Streets Award |
March 2019 Selection |
CSP |
2020 |
Construction |
200,000 |
200,000 |
PASCO |
Lewis Street |
2nd Ave to Oregon Ave (SR 397) |
UAP |
2021 |
Construction |
7,000,000 |
25,690,769 |
PASCO |
Court Street Roundabout |
Rd 68 Roundabout |
UAP |
2025 |
Design |
1,600,000 |
3,278,900 |
PATEROS |
Commercial Avenue Multimodal Improvements |
Lakeshore Drive to S Dawson Street |
CSP |
2026 |
Application |
881,239 |
981,239 |
PATEROS |
Downtown ADA Improvements |
Multiple Locations |
ATP |
2024 |
Design |
489,877 |
489,877 |
PATEROS |
Resin Bonded Stone Surfacing Pilot |
Intersection Vicinity |
ATP |
2025 |
Design |
136,000 |
136,000 |
PE ELL |
Main Street |
Chehalis Ave to SR 6 |
SCAP |
2024 |
Construction |
421,869 |
422,869 |
PE ELL |
Main Street Sidewalk |
E 7th Ave to E 6th Ave |
ATP |
2024 |
Construction |
55,190 |
55,190 |
PIERCE COUNTY |
Canyon Rd E |
400 ft N of 84th St E to 530 ft N of 72nd St E |
UAP |
2022 |
Construction |
4,000,000 |
8,535,329 |
PIERCE COUNTY |
Canyon Road E |
208th St E to 200th St E |
UAP |
2023 |
Construction |
2,000,000 |
11,403,610 |
PIERCE COUNTY |
122nd Avenue E |
146th St Ct E to 136th St E |
UAP |
2025 |
Design |
5,000,000 |
18,501,901 |
PIERCE COUNTY |
Pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
403,486 |
504,358 |
PIERCE COUNTY |
2025 RRFB School Crossing |
Gem Height Dr @ 94th Ave E and 182nd St E and Ainsworth Ave S @ Garfield St |
ATP |
2025 |
Design |
619,840 |
824,000 |
PORT ANGELES |
2024 Marine Drive Overlay |
Tumwater Truck Route to Hill Street |
APP |
2025 |
Bid Auth |
740,148 |
1,140,149 |
PORT ANGELES |
8th Street |
Lincoln St to A St |
UAP |
2024 |
Design |
1,464,365 |
1,904,365 |
PORT ORCHARD |
Bethel Avenue |
Bethel Rd, Lincoln Ave SE, Mitchell Rd SE |
UAP |
2023 |
Bid Auth |
1,170,000 |
1,462,500 |
PORT ORCHARD |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
650,000 |
650,000 |
PORT ORCHARD |
LED Streetlight Conversion |
PSE Owned |
LED |
2021 |
Construction |
200,000 |
200,000 |
PORT TOWNSEND |
Tyler Street Overlay |
Jefferson St to Lawrence St |
APP |
2024 |
Design |
379,355 |
446,299 |
PORT TOWNSEND |
Discovery Road |
Rainier St to McClellan St |
UAP |
2022 |
Construction |
2,481,424 |
5,566,751 |
PORT TOWNSEND |
Lawrence Street Pedestrian Improvements |
Harrison Street to Tyler Street |
CSP |
2026 |
Application |
493,500 |
583,500 |
PORT TOWNSEND |
Washington Street and Walker Street Improvements |
Washington St and Gaines St to Walker St and Jefferson St |
ATP |
2025 |
Design |
198,600 |
234,000 |
POULSBO |
Noll Road and Johnson Parkway |
SR 305 to Storhoff Rd/Noll Rd Intersection |
UAP |
2020 |
Construction |
1,500,000 |
15,135,712 |
POULSBO |
Noll Road - Segment 3A |
Mesford Rd to NE Kevos Pond Dr |
UAP |
2022 |
Design |
1,360,000 |
3,020,000 |
POULSBO |
Noll Road Phase 3B |
Lincoln Rd NE to Kevos Pond Dr |
UAP |
2024 |
Design |
1,200,000 |
3,868,100 |
POULSBO |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
600,000 |
600,000 |
POULSBO |
LED Streetlight Conversion |
PSE Owned |
LED |
2021 |
Construction |
175,000 |
175,000 |
PROSSER |
Old Inland Empire Highway Sidewalk |
W C/L to Wine Country Rd |
ATP |
2024 |
Construction |
168,425 |
1,720,086 |
PROSSER |
Wine Country Road Lower Yakima Valley Pathway Connection |
Wine County Rd to Lower Yakima Valley Pathway Connection |
ATP |
2025 |
Bid Auth |
107,370 |
119,300 |
PULLMAN |
Military Hill Overlay |
Hall Drive and Stadium Way from Orion Drive southeast to Highway 27 |
APP |
2025 |
Construction |
530,288 |
680,854 |
PULLMAN |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
750,000 |
750,000 |
PULLMAN |
Downtown complete streets |
Grand Avenue to Spring Street |
CSP |
2026 |
Application |
1,000,000 |
9,190,844 |
PUYALLUP |
7th Street Sidewalk |
9th St to 11th St |
ATP |
2024 |
Design |
350,000 |
579,000 |
RAYMOND |
2024 Red Town Initiative |
Multiple Locations |
SCPP |
2025 |
Design |
1,520,000 |
1,600,000 |
RAYMOND |
2024 SW Raymond Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
563,744 |
593,411 |
RAYMOND |
Downtown Pedestrian Improvements |
Multiple Locations |
CSP |
2026 |
Application |
550,000 |
578,947 |
REARDAN |
Gravel Street Otta Seal |
Multiple Locations |
SCPP |
2024 |
Design |
850,000 |
850,000 |
REDMOND |
Redmond Way (SR 202) and NE 76th Street |
Bear Ck to E Lake Samm Pkwy; SR 202 to Fred Meyer |
UAP |
2021 |
Construction |
1,588,500 |
4,659,028 |
REDMOND |
Bel Red Road Buffered Bike Lanes |
NE 30th St to W Lake Sammamish Pkwy |
ATP |
2024 |
Design |
650,000 |
3,062,000 |
RENTON |
Rainier Avenue S/N |
S 3rd St (SR 900) to NW 3rd Pl |
UAP |
2023 |
Construction |
5,355,150 |
26,454,839 |
RENTON |
SW 43rd Street |
W C/L to SR 167 Ramps |
UAP |
2025 |
Application |
2,975,154 |
5,979,841 |
RENTON |
S 7th Street Improvements |
Oakesdale Ave S to Burnett Ave S |
ATP |
2025 |
Application |
187,000 |
1,637,000 |
REPUBLIC |
Gravel Street Otta Seal |
Multiple Locations |
SCPP |
2024 |
Design |
1,150,000 |
1,150,000 |
RICHLAND |
Downtown Connectivity Improvements |
George Washington Way and Jadwin Avenue from Bradley Blvd to Torbett St |
UAP |
2024 |
Design |
3,500,000 |
16,781,600 |
RICHLAND |
Gage Blvd/Center Parkway |
Gage Blvd to Tapteal Dr |
UCP |
2007 |
Construction |
644,320 |
7,321,641 |
RICHLAND |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
450,000 |
450,000 |
RICHLAND |
Jadwin Avenue Sidewalk |
Davenport St to Gillespie St |
ATP |
2024 |
Construction |
222,303 |
300,411 |
RIDGEFIELD |
S Royle Road |
S 15th St to S 5th Way |
UAP |
2023 |
Construction |
2,930,531 |
5,687,249 |
RIDGEFIELD |
Hillhurst Pedestrian Improvements |
Multiple Locations |
CSP |
2026 |
Application |
260,000 |
325,000 |
RITZVILLE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Design |
42,312 |
44,539 |
RITZVILLE |
1st Avenue Improvements |
Division St to Palouse St |
SCAP |
2025 |
Design |
441,731 |
480,142 |
RITZVILLE |
6th Avenue Sidewalk |
Division St to Chelan St |
ATP |
2024 |
Design |
392,853 |
413,529 |
ROCK ISLAND |
Douglas Street Improvements |
Rock Island Rd to 3rd St SW |
SCAP |
2025 |
Design |
106,850 |
898,350 |
ROCKFORD |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
67,600 |
67,600 |
ROCKFORD |
2024 Pavement Preservation |
Multiple Locations |
SCPP |
2025 |
Design |
160,450 |
160,450 |
ROY |
2021 Overlay |
McNaught St to Roy Elementary School |
SCPP |
2023 |
Construction |
105,573 |
111,128 |
ROY |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Design |
100,000 |
100,000 |
ROYAL CITY |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
229,648 |
241,735 |
ROYAL CITY |
2022 Overlay Award |
Multiple Locations |
SCPP |
2024 |
Design |
678,775 |
714,500 |
ROYAL CITY |
Apple Avenue NE Sidewalks |
Camelia St to Slate Ln NE |
SP |
2023 |
Construction |
348,396 |
425,736 |
RUSTON |
2024 Overlay |
52nd to Park Ave |
SCPP |
2025 |
Design |
352,222 |
370,760 |
RUSTON |
Park Street |
End of Road to Bennett St |
SCAP |
2023 |
Design |
628,502 |
708,502 |
SEATAC |
34th Avenue S |
S 160th St to S 166th St |
UAP |
2022 |
Construction |
2,000,000 |
6,812,836 |
SEATAC |
Airport Station Pedestrian Improvements |
S 176th St/32nd Ave S and S 180th St |
UAP |
2025 |
Design |
4,000,000 |
27,699,458 |
SEATAC |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
600,000 |
600,000 |
SEATTLE |
East Marginal Way S |
S Atlantic to S Spokane St. |
UAP |
2020 |
Construction |
3,000,000 |
19,393,875 |
SEATTLE |
Lake Washington Blvd. renovations |
Lake Park Drive S to S Juneau Street |
CSP |
2026 |
Application |
220,000 |
300,000 |
SEATTLE |
4th Avenue S Walkway |
S Royal Brougham Way to I 90 Off-Ramp |
SP |
2023 |
Design |
247,000 |
329,016 |
SEDRO WOOLLEY |
2024 N Reed Street Overlay |
SR 20 to Brickyard Creek |
APP |
2025 |
Design |
477,278 |
561,504 |
SEDRO WOOLLEY |
Township Street (SR 9) |
John Liner Rd / McGarigle Rd Intersection |
UAP |
2023 |
Design |
3,404,134 |
4,255,167 |
SEDRO WOOLLEY |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
500,000 |
500,000 |
SEDRO WOOLLEY |
Sidewalk and ADA Ramp Upgrades |
Multiple Locations |
CSP |
2026 |
Application |
454,636 |
534,866 |
SEDRO WOOLLEY |
Cascade Trail West Extension Phase 2A |
Holtcamp Rd to Hodgin St |
ATP |
2024 |
Design |
326,000 |
860,000 |
SELAH |
E Goodlander Road Signal |
Landcaster Rd Signal |
UAP |
2025 |
Bid Auth |
612,810 |
680,900 |
SEQUIM |
N Sequim Avenue |
Hendrickson St to Old Olympic Hwy |
UAP |
2022 |
Construction |
1,073,186 |
4,227,100 |
SHELTON |
Olympic Highway North |
C S to Wallace Kneeland Blvd |
UAP |
2025 |
Design |
3,688,752 |
4,098,614 |
SHORELINE |
145th Street (SR 523) |
3rd Ave NE to 5th Ave NE (I-5 Interchange) |
UAP |
2023 |
Construction |
5,000,000 |
40,621,677 |
SHORELINE |
N 145th Street (SR 523) Phase 1 |
Corliss Ave N to 3rd Ave NE |
UAP |
2024 |
Construction |
5,000,000 |
11,845,978 |
SHORELINE |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
600,000 |
600,000 |
SHORELINE |
8th Avenue NW Sidewalk |
Sunset School Park to Richmond Beach Rd NW |
ATP |
2025 |
Design |
330,000 |
1,870,942 |
SNOHOMISH |
2022 Overlay Award |
Multiple Locations |
APP |
2024 |
Design |
424,999 |
500,000 |
SNOHOMISH |
Avenue D Overlay |
Multiple Locations |
APP |
2025 |
Design |
455,353 |
535,710 |
SNOHOMISH |
13th Street Intersection Improvements |
Park Ave |
ATP |
2025 |
Design |
177,539 |
208,870 |
SNOHOMISH COUNTY |
35th Avenue W |
156th St SW to 148th St SW |
UAP |
2023 |
Construction |
3,062,777 |
4,000,864 |
SNOHOMISH COUNTY |
Larch Way Roundabout |
Locust Wy and Logan Rd |
UAP |
2024 |
Construction |
2,875,000 |
4,205,001 |
SNOHOMISH COUNTY |
Alderwood Mall Parkway |
SR 525 to 168th St SW |
UAP |
2025 |
Design |
4,500,000 |
16,155,483 |
SNOHOMISH COUNTY |
Pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
368,700 |
461,215 |
SNOHOMISH COUNTY |
Hilltop Elementary Sidewalk |
Damson Rd MP 0.18 to MP 0.24 |
ATP |
2024 |
Construction |
259,452 |
330,023 |
SNOHOMISH COUNTY |
Puget Park Drive RRFBs |
Various |
ATP |
2025 |
Design |
195,914 |
301,406 |
SNOQUALMIE |
384th Ave SE Sidewalk |
Newton Ave to SE Kimball Creek Dr |
ATP |
2024 |
Design |
548,856 |
4,093,991 |
SOAP LAKE |
2021 Small City Maintenance |
Multiple Locations |
SCPP |
2023 |
Closeout |
47,829 |
47,829 |
SOAP LAKE |
2024 Scrub Seal - Red Town Initative |
Multiple Locations |
SCPP |
2024 |
Design |
2,150,000 |
2,150,000 |
SOAP LAKE |
Canna Street and 1st Avenue NE |
Main Ave E to SR 17 |
SCAP |
2023 |
Design |
871,740 |
898,700 |
SOAP LAKE |
Main Avenue W |
Cherry St S to Ginkgo St S |
SCAP |
2024 |
Design |
1,150,000 |
1,150,000 |
SOUTH BEND |
First Street |
A St to C St |
SCAP |
2025 |
Design |
546,587 |
575,354 |
SOUTH CLE ELUM |
2024 Chip Seal |
Madison Ave. and 6th St |
SCPP |
2025 |
Design |
47,460 |
47,460 |
SOUTH PRAIRIE |
2024 Otta Seal |
Multiple Locations |
SCPP |
2024 |
Bid Auth |
145,000 |
145,000 |
SOUTH PRAIRIE |
2024 Maintenance Project |
Citywide Crack Seal |
SCPP |
2025 |
Bid Auth |
3,130 |
3,130 |
SOUTH PRAIRIE |
Pioneer Way E (SR 162) |
Emery St |
SCAP |
2025 |
Design |
785,622 |
785,622 |
SPANGLE |
2024 Scrub Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
194,643 |
194,643 |
SPOKANE |
Thor / Freya Couplet |
Hartson Ave to 150ft n/o Sprague Ave |
UAP |
2022 |
Construction |
267,333 |
3,462,911 |
SPOKANE |
Maple Street and Walnut Street |
5th Ave to 1st Ave |
UAP |
2024 |
Design |
920,400 |
1,534,000 |
SPOKANE |
Riverside Ave. |
Monroe St to Wall St |
UAP |
2025 |
Design |
887,000 |
1,774,000 |
SPOKANE |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
300,000 |
300,000 |
SPOKANE |
Traffic Calming - Cycle 10 |
Multiple Locations |
CSP |
2026 |
Application |
500,000 |
2,974,904 |
SPOKANE |
Haven Street Sidewalk |
Rockwell Ave to Heroy Ave |
SP |
2023 |
Construction |
177,348 |
283,276 |
SPOKANE COUNTY |
Bigelow Gulch Road |
Progress Rd to Wellesley Ave |
UAP |
2021 |
Construction |
2,065,000 |
5,410,704 |
SPOKANE COUNTY |
Lincoln Road |
Crestline St to Market St |
UAP |
2022 |
Closeout |
1,092,500 |
2,016,629 |
SPOKANE COUNTY |
57th Avenue |
Mt Vernon St (MP 0.88) to Palouse HWY (MP 1.75) |
UAP |
2023 |
Construction |
1,419,941 |
1,774,926 |
SPOKANE COUNTY |
Hatch Road Phase 1 |
MP 0.60 to MP 1.10 |
UAP |
2024 |
Design |
1,508,999 |
2,011,000 |
SPOKANE COUNTY |
Hatch Road Reconstruction Phase 2 |
MP 1.10 to MP 1.63 |
UAP |
2025 |
Design |
2,434,400 |
3,043,000 |
SPOKANE COUNTY |
Rowan Ave. ADA Ramp Replacement |
Starr Rd to Idaho Rd |
ATP |
2025 |
Design |
425,360 |
553,000 |
SPOKANE VALLEY |
Sullivan Road |
Sprague Ave to 8th Ave |
UAP |
2023 |
Construction |
1,641,462 |
4,899,109 |
SPOKANE VALLEY |
Broadway Avenue Concrete Intersection |
Park Rd |
UAP |
2024 |
Construction |
1,655,420 |
2,554,394 |
SPOKANE VALLEY |
8th Avenue |
Coleman Rd to Park Rd |
SP |
2023 |
Construction |
310,700 |
2,773,685 |
SPOKANE VALLEY |
8th Avenue Pedestrian and Bicycle |
Fancher Rd to Park Rd |
ATP |
2024 |
Construction |
424,158 |
2,744,180 |
SPOKANE VALLEY |
Sprague Ave. Pedestrian Crossings |
Chronicle Rd and McKinnon Rd |
ATP |
2025 |
Design |
479,588 |
666,096 |
SPRAGUE |
4th Street Sidewalk |
SR 23 to E St |
ATP |
2024 |
Design |
490,900 |
490,900 |
SPRINGDALE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
39,734 |
39,734 |
STANWOOD |
2024 Overlay |
Multiple Locations |
APP |
2025 |
Bid Auth |
632,123 |
743,675 |
STEILACOOM |
Townwide RRFB Project |
Steilacoom Blvd, Union Ave and Puyallup St |
ATP |
2024 |
Construction |
215,209 |
286,946 |
STEVENSON |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
144,907 |
152,534 |
STEVENSON |
2024 Chip Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
71,268 |
75,020 |
STEVENSON |
1st Street |
Columbia St to Guardrail |
SCAP |
2025 |
Design |
221,186 |
884,186 |
SUMNER |
Stewart Road White River Bridge |
Butte Ave E to 140th Ave Ct E |
UAP |
2024 |
Bid Auth |
6,000,000 |
27,447,350 |
SUMNER |
Pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
500,000 |
625,000 |
SUMNER |
Elm Street Sidewalks |
Bonney Ave to Wright Ave |
ATP |
2024 |
Design |
359,200 |
552,484 |
SUNNYSIDE |
Yakima Valley Highway Overlay |
1st St to 6th St |
APP |
2025 |
Design |
425,871 |
473,190 |
SUNNYSIDE |
Citywide pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
500,000 |
588,235 |
SUNNYSIDE |
6th Street |
North Ave to Decatur Ave |
SP |
2023 |
Construction |
348,542 |
4,256,439 |
TACOMA |
E 64th Street |
McKinley Ave E to Portland Ave |
UAP |
2023 |
Bid Auth |
4,000,000 |
8,169,000 |
TACOMA |
Sheridan Avenue Phase 1 |
S 72nd St to S 64th St |
UAP |
2024 |
Design |
3,560,000 |
5,954,332 |
TACOMA |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
450,000 |
450,000 |
TACOMA |
McKinley overlook complete streets |
East E Street to East F Street |
CSP |
2026 |
Application |
408,289 |
522,359 |
TACOMA |
S Yakima Avenue Sidewalk |
S 67th St to S 70th St |
SP |
2023 |
Construction |
242,483 |
426,392 |
TEKOA |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Design |
187,700 |
187,700 |
TEKOA |
2022 Maintenance Project |
Multiple Locations |
SCPP |
2024 |
Construction |
11,725 |
11,725 |
TENINO |
2024 Park Avenue Overlay |
6th St to Howard St |
SCPP |
2025 |
Design |
382,850 |
403,000 |
THURSTON COUNTY |
Marvin Road SE |
22nd Ave to Union Mills Rd |
UAP |
2024 |
Design |
3,750,000 |
7,009,459 |
THURSTON COUNTY |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
600,000 |
600,000 |
TIETON |
2024 Overlay |
Naches Ave to Tieton Ave |
SCPP |
2025 |
Design |
127,990 |
134,730 |
TIETON |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Design |
65,906 |
69,375 |
TONASKET |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
308,051 |
308,051 |
TONASKET |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
50,000 |
50,000 |
TONASKET |
Perfect Passage |
1st Street to 4th Street |
CSP |
2026 |
Application |
946,110 |
5,639,855 |
TOPPENISH |
Jackson Street and Juniper Street |
Monroe Ave to Magnolia St |
UAP |
2023 |
Design |
1,386,360 |
1,540,400 |
TUKWILA |
West Valley Highway (SR 181) |
Strander Bvd to I-405 |
UAP |
2019 |
Construction |
2,115,432 |
4,834,855 |
TUKWILA |
Southcenter Boulevard Signal |
65th Avenue S |
UAP |
2025 |
Design |
782,090 |
1,182,090 |
TUKWILA |
S 119th Street Crossing |
42nd Ave S Crossing |
ATP |
2024 |
Construction |
174,999 |
261,359 |
TUMWATER |
Capitol Boulevard South, Trosper Road SE |
Ruby St to Market, Linda St to I-5 |
UAP |
2019 |
Construction |
9,829,120 |
18,424,998 |
TUMWATER |
Tumwater Boulevard |
NB I-5 On/Off Ramp Intersection |
UAP |
2024 |
Design |
2,250,000 |
6,250,000 |
TUMWATER |
Linwood Avenue Sidewalk |
Susitna Ln to 2nd Ave |
SP |
2023 |
Design |
371,250 |
825,000 |
TWISP |
2024 Complete Streets |
Multiple Locations |
CSP |
2026 |
Application |
42,750 |
45,000 |
TWISP |
North End SR 20 PedestrianBike Path |
Twisp River Br to Days Ln |
ATP |
2025 |
Design |
611,372 |
1,664,962 |
UNIONTOWN |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Bid Auth |
224,753 |
224,753 |
UNIONTOWN |
2023 Otta Seal |
Multiple Locations |
SCPP |
2024 |
Bid Auth |
450,000 |
450,000 |
UNIVERSITY PLACE |
Grandview Avenue Roundabout |
36th St |
UAP |
2025 |
Design |
664,480 |
830,600 |
VANCOUVER |
SE 1st Street |
SE 164th Avenue to SE 177th Avenue |
UAP |
2020 |
Construction |
2,825,424 |
10,944,587 |
VANCOUVER |
SE 1st Street |
SE 177th Ave to SE 192nd Ave |
UAP |
2021 |
Construction |
1,892,899 |
11,369,281 |
VANCOUVER |
W Fourth Plain Boulevard |
Franklin St Intersection |
UAP |
2023 |
Construction |
540,176 |
904,167 |
VANCOUVER |
NE 137th Avenue |
NE 49th St to NE Fourth Plain Blvd |
UAP |
2024 |
Bid Auth |
3,250,000 |
16,316,000 |
VANCOUVER |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
500,000 |
500,000 |
VANCOUVER |
Fourth Plain Boulevard |
Fort Vancouver Way to Andresen Road |
CSP |
2026 |
Application |
500,000 |
4,185,000 |
VANCOUVER |
Hazel Dell Avenue Multiuse Path |
Discovery Trail to Burnt Bridge Creek Greenway |
ATP |
2024 |
Design |
500,000 |
683,000 |
WALLA WALLA |
Clinton Street Overlay |
Isaacs Ave to Sumach St |
APP |
2025 |
Design |
400,000 |
1,203,000 |
WALLA WALLA |
E Chestnut Street Roundabout |
Approximately 200ft north south east and west |
UAP |
2025 |
Design |
1,110,000 |
1,510,000 |
WALLA WALLA |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
300,000 |
300,000 |
WALLA WALLA |
Citywide pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
541,248 |
854,061 |
WAPATO |
2022 Crack Seal |
Multiple Locations |
SCPP |
2024 |
Closeout |
19,903 |
20,950 |
WAPATO |
2024 Otta Seal |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
950,000 |
1,000,000 |
WAPATO |
S Naches Avenue |
1st St to 4th St |
SCAP |
2024 |
Design |
806,550 |
849,000 |
WAPATO |
N Ahtanum Avenue Reconstruction |
W 1st St to End of Road |
SCAP |
2025 |
Design |
807,975 |
850,500 |
WAPATO |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
50,000 |
50,000 |
WARDEN |
1st Street North Reconstruction |
N County Rd to Railroad tracks |
SCAP |
2025 |
Design |
1,772,700 |
1,866,000 |
WARDEN |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
75,000 |
75,000 |
WARDEN |
W First Street (SR 170) Pathway |
S County Rd to Railroad R/W |
ATP |
2024 |
Design |
57,375 |
425,000 |
WASHOUGAL |
2024 Main Street Overlay |
Multiple Locations |
APP |
2025 |
Design |
628,426 |
739,325 |
WASHOUGAL |
Evergreen Way Sidewalk |
42nd St to Schmid Park |
ATP |
2025 |
Design |
523,764 |
616,193 |
WATERVILLE |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
210,845 |
210,845 |
WAVERLY |
2024 Scrub Seal |
Multiple Locations |
SCPP |
2025 |
Design |
107,572 |
107,572 |
WENATCHEE |
Springwater Avenue |
Woodward Dr to Western Ave |
UAP |
2021 |
Construction |
2,185,000 |
3,788,965 |
WENATCHEE |
McKittrick Street |
Pine St to Pershing St (City Limits) |
UAP |
2023 |
Bid Auth |
2,298,110 |
2,872,640 |
WENATCHEE |
Red Apple Road |
Vista Pl to Miller St |
UAP |
2024 |
Design |
1,919,228 |
2,399,035 |
WENATCHEE |
9th Street Corridor Improvements |
Miller St to BNSF Railroad Crossing |
UAP |
2025 |
Design |
1,199,000 |
1,499,170 |
WENATCHEE |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
600,000 |
600,000 |
WEST RICHLAND |
School zone pedestrian improvements |
Multiple Locations |
CSP |
2026 |
Application |
250,508 |
294,716 |
WEST RICHLAND |
Candy Mountain pathway |
500' West of Milky Way to Watkins Way |
CSP |
2026 |
Application |
131,739 |
210,739 |
WESTPORT |
N Forrest Street |
Ocean Ave to 400 ft n/o Sprague Ave |
SCAP |
2024 |
Design |
673,008 |
708,430 |
WHITE SALMON |
2022 Seal Coat Award |
Multiple Locations |
SCPP |
2024 |
Construction |
272,644 |
287,463 |
WILBUR |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
31,476 |
31,476 |
WILBUR |
2024 Overlay |
Multiple Locations |
SCPP |
2025 |
Design |
716,277 |
716,277 |
WILSON CREEK |
2024 Street Maintenance |
Multiple Locations |
SCPP |
2025 |
Bid Auth |
32,200 |
32,200 |
WINLOCK |
NW Arden Avenue |
NW Fir St to W Walnut St |
SCAP |
2025 |
Design |
814,076 |
856,923 |
WINTHROP |
Horizon Flats Road |
Twin Lakes Rd to 3650 feet south |
SCAP |
2023 |
Design |
961,136 |
1,011,723 |
WINTHROP |
Bridge Street Improvement Project |
Riverside Ave to Bluff St |
ATP |
2025 |
Design |
528,675 |
556,500 |
WOODINVILLE |
131st Avenue NE (SR 202) Trestle Replacement |
NE 175th St to NE 177th Pl |
UAP |
2025 |
Design |
5,000,000 |
16,287,938 |
WOODLAND |
2024 S Pekin Overlay |
Davidson Ave to n/o Marty Lp |
APP |
2025 |
Design |
632,394 |
702,660 |
WOODLAND |
W Scott Avenue |
Railroad Tracks to Pacific Ave |
UAP |
2020 |
Construction |
1,231,440 |
1,368,266 |
WOODLAND |
Guild Road and W Scott Avenue |
Schurman Way to Railroad Tracks |
UAP |
2020 |
Construction |
1,243,885 |
1,382,095 |
YACOLT |
W Hoag Street |
Parcel Ave to Railroad Ave |
SCAP |
2025 |
Design |
360,240 |
379,200 |
YAKIMA |
N 1st Street |
MLK Blvd to J St |
UAP |
2023 |
Construction |
1,500,000 |
11,378,665 |
YAKIMA |
Nob Hill Boulevard Overlay |
S 15th Ave to S 28th Ave |
UAP |
2024 |
Construction |
1,337,216 |
1,696,520 |
YAKIMA |
34th Avenue Roundabouts |
Fruitvale Boulevard to 34th Avenue |
UAP |
2025 |
Design |
2,087,102 |
4,100,000 |
YAKIMA |
Nob Hill Boulevard Improvements |
S 4th Ave to S 15th Ave |
UAP |
2025 |
Bid Auth |
1,219,320 |
1,570,850 |
YAKIMA |
Complete Streets Award |
March 2022 Selection |
CSP |
2023 |
Construction |
250,000 |
250,000 |
YAKIMA |
Pedestrian improvements |
Intersection at 5th Avenue and D Street |
CSP |
2026 |
Application |
198,300 |
573,300 |
YAKIMA COUNTY |
Ahtanum Road |
Yakima C/L to S 52nd Ave |
UAP |
2018 |
Design |
2,500,000 |
3,045,672 |
YAKIMA COUNTY |
Ahtanum Road |
Yakima C/L to S 52nd Ave |
UAP |
2018 |
Construction |
0 |
3,814,062 |
YELM |
ADA Ramp Rehabilitation |
Multiple Locations |
CSP |
2026 |
Application |
263,500 |
310,000 |
YELM |
LED Streetlight Conversion |
PSE Owned |
LED |
2024 |
Construction |
50,750 |
50,750 |
ZILLAH |
8th Street Improvements |
Rainier Ave to First Ave |
SCAP |
2025 |
Design |
571,376 |
631,880 |